Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Height, length, breadth Breadth, length, height None of these Length, breadth, height Height, length, breadth Breadth, length, height None of these Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of works All of these Specifications of materials Proportion of mortar Specifications of works All of these Specifications of materials Proportion of mortar ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at Right angle to the centre line All of these 30 meters apart Intermediate points having abrupt change in gradient Right angle to the centre line All of these 30 meters apart Intermediate points having abrupt change in gradient ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 50 D 30 D 59 D 39 D 50 D 30 D 59 D 39 D ANSWER DOWNLOAD EXAMIANS APP