The rate of an item of work depends on

Specifications of works
Proportion of mortar
All of these
Specifications of materials

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While preparing a detailed estimate

All of these
Area should be measured correct to 0.01 sqm
Volume should be measured correct to 0.01 cum
Dimension should be measured correct to 0.01 m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

½ × (b + rd)²/(r - s)
⅓ × (b - rd)²/(r + s)
⅓ × (b - rd)²/(r - s)
⅓ × (b - rd)²/(s - r)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The detention period in a septic tank is assumed

20 minutes
30 minutes
40 minutes
25 minutes

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made in square metre in case of

Hollow concrete block wall
None of these
Cement concrete in foundation
R.C.C. structure

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The weight of an item is measured correct to nearest

0.25 kg
0.75 kg
1.00 kg
0.50 kg

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑