Estimating and Costing The rate of an item of work depends on Proportion of mortar Specifications of materials All of these Specifications of works Proportion of mortar Specifications of materials All of these Specifications of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.25 0.5 1 0.75 0.25 0.5 1 0.75 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Plinth area estimate Cube rate estimate Detailed estimate Preliminary estimate Plinth area estimate Cube rate estimate Detailed estimate Preliminary estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Half brick wall Brick work in arches One or more than one brick wall Reinforced brick work Half brick wall Brick work in arches One or more than one brick wall Reinforced brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 1.00 m³ 0.98 m³ 0.90 m³ 0.94 m³ 1.00 m³ 0.98 m³ 0.90 m³ ANSWER DOWNLOAD EXAMIANS APP