Estimating and Costing The rate of an item of work depends on Specifications of materials All of these Proportion of mortar Specifications of works Specifications of materials All of these Proportion of mortar Specifications of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3300 m³ 3275 m³ 3250 m³ 3225 m³ 3300 m³ 3275 m³ 3250 m³ 3225 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 2000 m3 500 m3 1500 m3 1000 m3 2000 m3 500 m3 1500 m3 1000 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Bolts Brackets Cleats All listed here Bolts Brackets Cleats All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 10 sqm 2.5 sqm 7.5 sqm 5.0 sqm 10 sqm 2.5 sqm 7.5 sqm 5.0 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are All of these Fully in embankment Fully in excavation Partly in excavation and partly in embankment All of these Fully in embankment Fully in excavation Partly in excavation and partly in embankment ANSWER DOWNLOAD EXAMIANS APP