Estimating and Costing The rate of an item of work depends on Proportion of mortar Specifications of works All of these Specifications of materials Proportion of mortar Specifications of works All of these Specifications of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3225 m³ 3300 m³ 3275 m³ 3250 m³ 3225 m³ 3300 m³ 3275 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 1500 m3 1000 m3 2000 m3 500 m3 1500 m3 1000 m3 2000 m3 500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of One or more than one brick wall Reinforced brick work Half brick wall Brick work in arches One or more than one brick wall Reinforced brick work Half brick wall Brick work in arches ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of direction At every change of gradient All of these At every 30 m intervals At every change of direction At every change of gradient All of these At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP