Estimating and Costing The rate of an item of work depends on Specifications of works Proportion of mortar All of these Specifications of materials Specifications of works Proportion of mortar All of these Specifications of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate All of these Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m All of these Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 20 minutes 30 minutes 40 minutes 25 minutes 20 minutes 30 minutes 40 minutes 25 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of Hollow concrete block wall None of these Cement concrete in foundation R.C.C. structure Hollow concrete block wall None of these Cement concrete in foundation R.C.C. structure ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 0.25 kg 0.75 kg 1.00 kg 0.50 kg 0.25 kg 0.75 kg 1.00 kg 0.50 kg ANSWER DOWNLOAD EXAMIANS APP