Estimating and Costing

Estimating and Costing
The rate of an item of work depends on

Proportion of mortar
Specifications of materials
All of these
Specifications of works

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the excavation where measurements are made in square meters for payment.

Ordinary cuttings up to 1 m
Both (B) and (C)
Surface dressing up to 15 cm depths
Surface excavation up to 30 cm depths

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Anti-siphonage pipe is connected to

Side of water closet
Main soil pipe
Top of P trap W.C.
Bottom of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The brick work is measured in sq metre, in case of

Half brick walls or the partition
Brick flat soling
Honey comb brick work
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

0.04
0.025
0.02
0.05

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

None of these
Breadth of the wall
One fourth breadth of wall on each side
Half breadth of wall on each side

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑