Estimating and Costing

Estimating and Costing
The item of the brick structure measured in sq.m, is

Broken glass coping
Brick work in arches
Brick edging
Reinforced brick work

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The volume is measured correct to the nearest

0.01 cum
0.02 cum
0.03 cum
0.04 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For the construction of buildings, the subheads of the estimate are

Earthwork, Concrete work, Brick work
All of these
Brickwork Flooring, Wood work, Steel work
Brickwork, Stone work, Roofing

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

1.5 m³
5.0 m³
3.5 m³
2.5 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

Cleats
All listed here
Brackets
Bolts

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Cost of fittings and their fixing is specified for the following sanitary fittings

Flushing pipes
Lavatory basins
Water closets
All listed here

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑