Estimating and Costing The item of the brick structure measured in sq.m, is Reinforced brick work Brick work in arches Broken glass coping Brick edging Reinforced brick work Brick work in arches Broken glass coping Brick edging ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Breadth, length, height None of these Height, breadth, length Length, breadth, height Breadth, length, height None of these Height, breadth, length Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs Floors Wall panels All of these Root slabs Floors Wall panels All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building The centre line is worked out separately for different sections of walls of a building All of these Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line length is reduced by half the layer of main wall joining the partition wall The centre line is worked out separately for different sections of walls of a building All of these Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line length is reduced by half the layer of main wall joining the partition wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.75 0.25 0.5 1 0.75 0.25 0.5 1 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of materials All of these Specifications of works Proportion of mortar Specifications of materials All of these Specifications of works Proportion of mortar ANSWER DOWNLOAD EXAMIANS APP