Estimating and Costing The item of the brick structure measured in sq.m, is Broken glass coping Brick edging Reinforced brick work Brick work in arches Broken glass coping Brick edging Reinforced brick work Brick work in arches ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Length, breadth, height Breadth, length, height None of these Height, breadth, length Length, breadth, height Breadth, length, height None of these Height, breadth, length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 7.5 sqm 10 sqm 2.5 sqm 5.0 sqm 7.5 sqm 10 sqm 2.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.80 liters for 5 to 10 users 1.20 liters for 15 users 1.35 for 20 users All of these 1.80 liters for 5 to 10 users 1.20 liters for 15 users 1.35 for 20 users All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is All of these Transportation of materials Availability of materials Quantity of the materials All of these Transportation of materials Availability of materials Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for Stop-cocks All of these Ball valves Bib-cocks Stop-cocks All of these Ball valves Bib-cocks ANSWER DOWNLOAD EXAMIANS APP