Estimating and Costing The item of the brick structure measured in sq.m, is Broken glass coping Brick edging Brick work in arches Reinforced brick work Broken glass coping Brick edging Brick work in arches Reinforced brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Proportion of mortar All of these Specifications of works Specifications of materials Proportion of mortar All of these Specifications of works Specifications of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m All listed here Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Floors Wall panels All of these Root slabs Floors Wall panels All of these Root slabs ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface excavation Surface dressing Cutting Excavation Surface excavation Surface dressing Cutting Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.01 cum 0.02 cum 0.03 cum 0.04 cum 0.01 cum 0.02 cum 0.03 cum 0.04 cum ANSWER DOWNLOAD EXAMIANS APP