Estimating and Costing The item of the brick structure measured in sq.m, is Brick work in arches Brick edging Reinforced brick work Broken glass coping Brick work in arches Brick edging Reinforced brick work Broken glass coping ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Half brick wall Brick work in arches Reinforced brick work One or more than one brick wall Half brick wall Brick work in arches Reinforced brick work One or more than one brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 175 mm 100 mm 150 mm 200 mm 175 mm 100 mm 150 mm 200 mm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item All of these The centre line is worked out separately for different sections of walls of a building The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item All of these The centre line is worked out separately for different sections of walls of a building The centre line length is reduced by half the layer of main wall joining the partition wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 500 m3 2000 m3 1500 m3 1000 m3 500 m3 2000 m3 1500 m3 1000 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 75 cm to 80 cm 60 cm 70 cm 80 cm 75 cm to 80 cm 60 cm 70 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP