Estimating and Costing
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

Prismoidal formula
Mid-section formula
All of these
Trapezoidal formula

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Size, capacity and materials need be specified for

All of these
Bib-cocks
Stop-cocks
Ball valves

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

8.0 sq m
4.0 sq m
2.5 sq m
6.0 sq m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Excavation
Surface dressing
Surface excavation
Cutting

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

B × d - Sd1/2
B + d + Sd
Bd + Sd2
½ (Bd + Sd2)

ANSWER DOWNLOAD EXAMIANS APP
  • «
  • 1
  • 2
  • 3
  • ...
  • 16
  • »

GO TO PAGE

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑