Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula Trapezoidal formula All of these Prismoidal formula Mid-section formula Trapezoidal formula All of these Prismoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for Stop-cocks Ball valves Bib-cocks All of these Stop-cocks Ball valves Bib-cocks All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 4.0 sq m 8.0 sq m 2.5 sq m 6.0 sq m 4.0 sq m 8.0 sq m 2.5 sq m 6.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Surface dressing Surface excavation Excavation Cutting Surface dressing Surface excavation Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd Bd + Sd2 ANSWER DOWNLOAD EXAMIANS APP