Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 B + d + Sd ½ (Bd + Sd2) Bd + Sd2 B × d - Sd1/2 B + d + Sd ½ (Bd + Sd2) Bd + Sd2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 10° 8° 14° 12° 10° 8° 14° 12° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes All of these Bed concreting Setting and laying Connection to drains All of these Bed concreting Setting and laying Connection to drains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Preliminary estimate Cube rate estimate Plinth area estimate Detailed estimate Preliminary estimate Cube rate estimate Plinth area estimate Detailed estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 150 mm 100 mm 200 mm 175 mm 150 mm 100 mm 200 mm 175 mm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 23 cm x 11.5 cm x 7.5 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm 20 cm x 10 cm x 10 cm ANSWER DOWNLOAD EXAMIANS APP