Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 ½ (Bd + Sd2) Bd + Sd2 B + d + Sd B × d - Sd1/2 ½ (Bd + Sd2) Bd + Sd2 B + d + Sd ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m All of these Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Top of P trap W.C. Main soil pipe Bottom of P trap W.C. Side of water closet Top of P trap W.C. Main soil pipe Bottom of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.025 0.05 0.04 0.02 0.025 0.05 0.04 0.02 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.02 sqm 0.01 sqm 0.04 sqm 0.03 sqm 0.02 sqm 0.01 sqm 0.04 sqm 0.03 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of Half brick walls or the partition Honey comb brick work Brick flat soling All of these Half brick walls or the partition Honey comb brick work Brick flat soling All of these ANSWER DOWNLOAD EXAMIANS APP