Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is Bd + Sd2 B × d - Sd1/2 ½ (Bd + Sd2) B + d + Sd Bd + Sd2 B × d - Sd1/2 ½ (Bd + Sd2) B + d + Sd ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 2000 m3 500 m3 1000 m3 1500 m3 2000 m3 500 m3 1000 m3 1500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken All of these 1.35 for 20 users 1.20 liters for 15 users 1.80 liters for 5 to 10 users All of these 1.35 for 20 users 1.20 liters for 15 users 1.80 liters for 5 to 10 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 10° 14° 12° 8° 10° 14° 12° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in excavation All of these Fully in embankment Partly in excavation and partly in embankment Fully in excavation All of these Fully in embankment Partly in excavation and partly in embankment ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Wall panels Root slabs Floors All of these Wall panels Root slabs Floors All of these ANSWER DOWNLOAD EXAMIANS APP