Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: The water seal is less than that of ordinary traps It is provided in between the lower end of the house drain and the street sewer It is provided a cleaning eye at the top of the trap The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe The water seal is less than that of ordinary traps It is provided in between the lower end of the house drain and the street sewer It is provided a cleaning eye at the top of the trap The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Meter for length Liter for capacity Cubic metre for area Square meters for volume Meter for length Liter for capacity Cubic metre for area Square meters for volume ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Reinforced brick work Brick work in arches Brick edging Broken glass coping Reinforced brick work Brick work in arches Brick edging Broken glass coping ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of Bath room and lavatory Kitchen and pantry The walls along with doors and other openings All of these Bath room and lavatory Kitchen and pantry The walls along with doors and other openings All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 4.0 sq m 2.5 sq m 8.0 sq m 6.0 sq m 4.0 sq m 2.5 sq m 8.0 sq m 6.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these ANSWER DOWNLOAD EXAMIANS APP