Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work All of these Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called All listed here Intercepting trap Interception manhole Master trap All listed here Intercepting trap Interception manhole Master trap ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is All listed here Ventilators and glazing Rolling shutters Collapsible gates All listed here Ventilators and glazing Rolling shutters Collapsible gates ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 1.00 m³ 0.90 m³ 0.98 m³ 0.94 m³ 1.00 m³ 0.90 m³ 0.98 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is None of these (6 + 12) chains (6 + 18) chains (6 + 15) chains None of these (6 + 12) chains (6 + 18) chains (6 + 15) chains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Steps in deep excavation Site clearance All listed here Setting out of works Steps in deep excavation Site clearance All listed here Setting out of works ANSWER DOWNLOAD EXAMIANS APP