Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.04 cum 0.03 cum 0.01 cum 0.02 cum 0.04 cum 0.03 cum 0.01 cum 0.02 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Plinth area estimate Preliminary estimate Cube rate estimate Detailed estimate Plinth area estimate Preliminary estimate Cube rate estimate Detailed estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The mid-area of a pyramid is half the average area of the ends All listed here The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The mid-area of a pyramid is half the average area of the ends All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 2.5 sqm 5.0 sqm 7.5 sqm 10 sqm 2.5 sqm 5.0 sqm 7.5 sqm 10 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The plinth area of a building not includes Internal shaft for sanitary installations up to 2 sq m. in area Lift and wall including landing Area of cantilevered porch Area of the walls at the floor level Internal shaft for sanitary installations up to 2 sq m. in area Lift and wall including landing Area of cantilevered porch Area of the walls at the floor level ANSWER DOWNLOAD EXAMIANS APP