Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Wall panels Root slabs All of these Floors Wall panels Root slabs All of these Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Courtyard area Wall thickness W' Area Room area Courtyard area Wall thickness W' Area Room area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by All of these Trapezoidal formula Prismoidal formula Mid-section formula All of these Trapezoidal formula Prismoidal formula Mid-section formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Building work Wall facing (A) and (B) of the above Columns, lintels, copings Building work Wall facing (A) and (B) of the above Columns, lintels, copings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Hexagonal buildings Octagonal buildings All of these Circular buildings Hexagonal buildings Octagonal buildings All of these Circular buildings ANSWER DOWNLOAD EXAMIANS APP