Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.98 m³ 0.90 m³ 1.00 m³ 0.94 m³ 0.98 m³ 0.90 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.02 0.025 0.04 0.05 0.02 0.025 0.04 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.01 cum 0.02 cum 0.04 cum 0.03 cum 0.01 cum 0.02 cum 0.04 cum 0.03 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: Collapsible gates with rails M.S. reinforcement of R.C.C. works Rolling shutters Expanded metal wire netting Collapsible gates with rails M.S. reinforcement of R.C.C. works Rolling shutters Expanded metal wire netting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of gradient At every 30 m intervals At every change of direction All of these At every change of gradient At every 30 m intervals At every change of direction All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s ANSWER DOWNLOAD EXAMIANS APP