Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.98 m³ 1.00 m³ 0.90 m³ 0.94 m³ 0.98 m³ 1.00 m³ 0.90 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Cutting through walls and floors are included with the item All of these Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item All of these Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 1.00 cum 2.00 cum 4.00 cum 3.00 cum 1.00 cum 2.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Site clearance Steps in deep excavation All listed here Setting out of works Site clearance Steps in deep excavation All listed here Setting out of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ ANSWER DOWNLOAD EXAMIANS APP