Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in Meters Cub. m Sq. m None of these Meters Cub. m Sq. m None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 15 cm None of these 20 cm 10 cm 15 cm None of these 20 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of One or more than one brick wall Reinforced brick work Brick work in arches Half brick wall One or more than one brick wall Reinforced brick work Brick work in arches Half brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula Prismoidal formula All of these Trapezoidal formula Mid-section formula Prismoidal formula All of these Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 1.5 m2 2.0 m2 5.0 m2 4.0 m2 1.5 m2 2.0 m2 5.0 m2 4.0 m2 ANSWER DOWNLOAD EXAMIANS APP