Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 1.00 m³ 0.90 m³ 0.98 m³ 0.94 m³ 1.00 m³ 0.90 m³ 0.98 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of All of these Rock cutting Earth work in excavation Excavation in trenches for foundation All of these Rock cutting Earth work in excavation Excavation in trenches for foundation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Site clearance All listed here Steps in deep excavation Setting out of works Site clearance All listed here Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is None of these Height, length, breadth Length, breadth, height Breadth, length, height None of these Height, length, breadth Length, breadth, height Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Meter for length Cubic metre for area Liter for capacity Square meters for volume Meter for length Cubic metre for area Liter for capacity Square meters for volume ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 0.75 kg 0.25 kg 1.00 kg 0.50 kg 0.75 kg 0.25 kg 1.00 kg 0.50 kg ANSWER DOWNLOAD EXAMIANS APP