Estimating and Costing

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.94 m³
1.00 m³
0.90 m³
0.98 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of payment is made for 100 cu m (per % cu m) in case of

All of these
Rock cutting
Earth work in excavation
Excavation in trenches for foundation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

Setting out of works
Site clearance
All listed here
Steps in deep excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
According to ISI method of measurement, the order of the sequence is

None of these
Height, length, breadth
Length, breadth, height
Breadth, length, height

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While estimating the qualities for the construction of a building, the correct metric unit is

Meter for length
Cubic metre for area
Liter for capacity
Square meters for volume

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The weight of an item is measured correct to nearest

0.75 kg
0.25 kg
1.00 kg
0.50 kg

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑