Estimating and Costing

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.90 m³
0.98 m³
0.94 m³
1.00 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The unit of measurement is per quintal for the following:

M.S. reinforcement of R.C.C. works
Rolling shutters
Collapsible gates with rails
Expanded metal wire netting

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of steel work which is measured in sq.m, is

Collapsible gates
Ventilators and glazing
Rolling shutters
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While preparing a detailed estimate

Dimension should be measured correct to 0.01 m
Volume should be measured correct to 0.01 cum
All of these
Area should be measured correct to 0.01 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Berms are provided in canals if these are

Partly in excavation and partly in embankment
Fully in excavation
Fully in embankment
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended

175 mm
200 mm
150 mm
100 mm

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑