Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 30 D 39 D 59 D 50 D 30 D 39 D 59 D 50 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is (6 + 12) chains None of these (6 + 18) chains (6 + 15) chains (6 + 12) chains None of these (6 + 18) chains (6 + 15) chains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Bolts Brackets All listed here Cleats Bolts Brackets All listed here Cleats ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Site clearance Steps in deep excavation All listed here Setting out of works Site clearance Steps in deep excavation All listed here ANSWER DOWNLOAD EXAMIANS APP