Estimating and Costing

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.90 m³
0.94 m³
1.00 m³
0.98 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For the construction of buildings, the subheads of the estimate are

All of these
Earthwork, Concrete work, Brick work
Brickwork Flooring, Wood work, Steel work
Brickwork, Stone work, Roofing

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of the brick structure measured in sq.m, is

Brick work in arches
Broken glass coping
Brick edging
Reinforced brick work

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

Bd + Sd2
B × d - Sd1/2
½ (Bd + Sd2)
B + d + Sd

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

Setting out of works
Steps in deep excavation
All listed here
Site clearance

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Cost of fittings and their fixing is specified for the following sanitary fittings

All listed here
Flushing pipes
Lavatory basins
Water closets

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑