For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.98 m³
1.00 m³
0.94 m³
0.90 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The concrete work for the following part of the building of specified thickness is measured in square meters

Wall panels
Root slabs
All of these
Floors

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Courtyard area
Wall thickness
W' Area
Room area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

All of these
Trapezoidal formula
Prismoidal formula
Mid-section formula

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made for stone work in square metre in case of

Building work
Wall facing
(A) and (B) of the above
Columns, lintels, copings

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The 'centre line method' is specially adopted for estimating

Hexagonal buildings
Octagonal buildings
All of these
Circular buildings

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑