Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 30 minutes 20 minutes 40 minutes 25 minutes 30 minutes 20 minutes 40 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) √[d² × (ds)²] d × d × s L.D √(1 + s²) 2 L.D √(1 + s²) √[d² × (ds)²] d × d × s L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is All listed here Cleats Bolts Brackets All listed here Cleats Bolts Brackets ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.35 for 20 users All of these 1.20 liters for 15 users 1.80 liters for 5 to 10 users 1.35 for 20 users All of these 1.20 liters for 15 users 1.80 liters for 5 to 10 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm ANSWER DOWNLOAD EXAMIANS APP