Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 1.00 m³ 0.98 m³ 0.90 m³ 0.94 m³ 1.00 m³ 0.98 m³ 0.90 m³ 0.94 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Trapezoidal formula Prismoidal formula Mid-section formula All of these Trapezoidal formula Prismoidal formula Mid-section formula All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Length, breadth, height None of these Height, breadth, length Breadth, length, height Length, breadth, height None of these Height, breadth, length Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is None of these (6 + 18) chains (6 + 12) chains (6 + 15) chains None of these (6 + 18) chains (6 + 12) chains (6 + 15) chains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Wall thickness Room area W' Area Courtyard area Wall thickness Room area W' Area Courtyard area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Transportation of materials Quantity of the materials All of these Availability of materials Transportation of materials Quantity of the materials All of these Availability of materials ANSWER DOWNLOAD EXAMIANS APP