Estimating and Costing

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.98 m³
0.90 m³
1.00 m³
0.94 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

50 D
30 D
59 D
39 D

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

At every change of direction
All of these
At every change of gradient
At every 30 m intervals

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The order of booking dimensions is

Breadth, length, height
Height, breadth, length
Length, breadth, height
None of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

4.00 cum
1.00 cum
3.00 cum
2.00 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of payment is made for 100 cu m (per % cu m) in case of

Excavation in trenches for foundation
All of these
Earth work in excavation
Rock cutting

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑