Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Brackets Bolts Cleats All listed here Brackets Bolts Cleats All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.25 m³ 1.50 m³ 1.00 m³ 1.75 m³ 1.25 m³ 1.50 m³ 1.00 m³ 1.75 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Lavatory basins Flushing pipes All listed here Water closets Lavatory basins Flushing pipes All listed here Water closets ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at Intermediate points having abrupt change in gradient All of these Right angle to the centre line 30 meters apart Intermediate points having abrupt change in gradient All of these Right angle to the centre line 30 meters apart ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 2.5 m³ 3.5 m³ 1.5 m³ 5.0 m³ 2.5 m³ 3.5 m³ 1.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 30 minutes 20 minutes 40 minutes 25 minutes 30 minutes 20 minutes 40 minutes ANSWER DOWNLOAD EXAMIANS APP