Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Bolts All listed here Cleats Brackets Bolts All listed here Cleats Brackets ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 2.00 cum 1.00 cum 4.00 cum 3.00 cum 2.00 cum 1.00 cum 4.00 cum 3.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in Meters None of these Cub. m Sq. m Meters None of these Cub. m Sq. m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Concrete Jeffries P.C. (Damp proof course) Form works R.C. Chhajja Concrete Jeffries P.C. (Damp proof course) Form works R.C. Chhajja ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Transportation of materials Quantity of the materials All of these Availability of materials Transportation of materials Quantity of the materials All of these Availability of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building The centre line is worked out separately for different sections of walls of a building All of these The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line is worked out separately for different sections of walls of a building All of these The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item ANSWER DOWNLOAD EXAMIANS APP