Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is All listed here Cleats Brackets Bolts All listed here Cleats Brackets Bolts ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Pipes are classified according to their sizes and quality Pipes laid in trenches and pipes fixed to walls are measured separately All of these Cutting through walls and floors are included with the item Pipes are classified according to their sizes and quality Pipes laid in trenches and pipes fixed to walls are measured separately All of these Cutting through walls and floors are included with the item ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in Meters Sq. m Cub. m None of these Meters Sq. m Cub. m None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Surface dressing Surface excavation Excavation Cutting Surface dressing Surface excavation Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of Bath room and lavatory The walls along with doors and other openings All of these Kitchen and pantry Bath room and lavatory The walls along with doors and other openings All of these Kitchen and pantry ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 20 minutes 30 minutes 40 minutes 25 minutes 20 minutes 30 minutes 40 minutes 25 minutes ANSWER DOWNLOAD EXAMIANS APP