Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is All listed here Bolts Brackets Cleats All listed here Bolts Brackets Cleats ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Columns, lintels, copings (A) and (B) of the above Building work Wall facing Columns, lintels, copings (A) and (B) of the above Building work Wall facing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and Half breadth of wall on each side One fourth breadth of wall on each side Breadth of the wall None of these Half breadth of wall on each side One fourth breadth of wall on each side Breadth of the wall None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work All of these Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Transportation of materials All of these Availability of materials Quantity of the materials Transportation of materials All of these Availability of materials Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.90 m³ 1.00 m³ 0.94 m³ 0.98 m³ 0.90 m³ 1.00 m³ 0.94 m³ 0.98 m³ ANSWER DOWNLOAD EXAMIANS APP