Estimating and Costing

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

Cleats
All listed here
Bolts
Brackets

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

B × d - Sd1/2
B + d + Sd
½ (Bd + Sd2)
Bd + Sd2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In case of laying gullies, siphons, intercepting traps, the cost includes

Bed concreting
Connection to drains
All of these
Setting and laying

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The main factor to be considered while preparing a detailed estimate, is

All of these
Transportation of materials
Availability of materials
Quantity of the materials

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended

200 mm
175 mm
150 mm
100 mm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

At every change of direction
At every 30 m intervals
All of these
At every change of gradient

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑