Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs Wall panels All of these Floors Root slabs Wall panels All of these Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality All of these Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 25 cm x 13 cm x 7.5 cm 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.25 m³ 1.75 m³ 1.00 m³ 1.50 m³ 1.25 m³ 1.75 m³ 1.00 m³ 1.50 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.04 0.02 0.025 0.05 0.04 0.02 0.025 0.05 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Bolts All listed here Brackets Cleats Bolts All listed here Brackets Cleats ANSWER DOWNLOAD EXAMIANS APP