Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Floors Wall panels Root slabs All of these Floors Wall panels ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate Area should be measured correct to 0.01 sqm All of these Dimension should be measured correct to 0.01 m Volume should be measured correct to 0.01 cum Area should be measured correct to 0.01 sqm All of these Dimension should be measured correct to 0.01 m Volume should be measured correct to 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 4.00 cum 1.00 cum 2.00 cum 3.00 cum 4.00 cum 1.00 cum 2.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.98 m³ 1.00 m³ 0.90 m³ 0.94 m³ 0.98 m³ 1.00 m³ 0.90 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken All of these 1.20 liters for 15 users 1.80 liters for 5 to 10 users 1.35 for 20 users All of these 1.20 liters for 15 users 1.80 liters for 5 to 10 users 1.35 for 20 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] ANSWER DOWNLOAD EXAMIANS APP