Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Floors Wall panels Root slabs All of these Floors Wall panels ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.50 m³ 1.25 m³ 1.00 m³ 1.75 m³ 1.50 m³ 1.25 m³ 1.00 m³ 1.75 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 3.5 m³ 1.5 m³ 2.5 m³ 5.0 m³ 3.5 m³ 1.5 m³ 2.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface dressing Surface excavation Excavation Cutting Surface dressing Surface excavation Excavation Cutting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of Kitchen and pantry The walls along with doors and other openings Bath room and lavatory All of these Kitchen and pantry The walls along with doors and other openings Bath room and lavatory All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 30 minutes 40 minutes 20 minutes 25 minutes 30 minutes 40 minutes 20 minutes 25 minutes ANSWER DOWNLOAD EXAMIANS APP