Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Wall panels Floors Root slabs All of these Wall panels Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 5.0 m2 4.0 m2 2.0 m2 1.5 m2 5.0 m2 4.0 m2 2.0 m2 1.5 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 40 minutes 30 minutes 25 minutes 20 minutes 40 minutes 30 minutes 25 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 30 D 59 D 50 D 39 D 30 D 59 D 50 D 39 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 1 0.75 0.25 0.5 1 0.75 0.25 0.5 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. All listed here Steps in deep excavation Site clearance Setting out of works All listed here Steps in deep excavation Site clearance Setting out of works ANSWER DOWNLOAD EXAMIANS APP