Estimating and Costing The unit of measurement is per quintal for the following: Collapsible gates with rails Expanded metal wire netting M.S. reinforcement of R.C.C. works Rolling shutters Collapsible gates with rails Expanded metal wire netting M.S. reinforcement of R.C.C. works Rolling shutters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work All of these Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work All of these Brickwork, Stone work, Roofing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The mean depth is the average of depths of two consecutive sections The area of mid-sections is calculated by using mean depth The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The mean depth is the average of depths of two consecutive sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd ½ (Bd + Sd2) B × d - Sd1/2 Bd + Sd2 B + d + Sd ½ (Bd + Sd2) B × d - Sd1/2 Bd + Sd2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.025 0.05 0.04 0.02 0.025 0.05 0.04 0.02 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.02 cum 0.04 cum 0.01 cum 0.03 cum 0.02 cum 0.04 cum 0.01 cum 0.03 cum ANSWER DOWNLOAD EXAMIANS APP