Estimating and Costing The unit of measurement is per quintal for the following: Collapsible gates with rails Expanded metal wire netting Rolling shutters M.S. reinforcement of R.C.C. works Collapsible gates with rails Expanded metal wire netting Rolling shutters M.S. reinforcement of R.C.C. works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 26,500 m³ 27,500 m³ 27,000 m³ 26,000 m³ 26,500 m³ 27,500 m³ 27,000 m³ 26,000 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Height, breadth, length None of these Breadth, length, height Length, breadth, height Height, breadth, length None of these Breadth, length, height Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.04 cum 0.03 cum 0.01 cum 0.02 cum 0.04 cum 0.03 cum 0.01 cum 0.02 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every 30 m intervals At every change of gradient At every change of direction All of these At every 30 m intervals At every change of gradient At every change of direction All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.03 sqm 0.04 sqm 0.01 sqm 0.02 sqm 0.03 sqm 0.04 sqm 0.01 sqm 0.02 sqm ANSWER DOWNLOAD EXAMIANS APP