Estimating and Costing
The unit of measurement is per quintal for the following:

Collapsible gates with rails
Expanded metal wire netting
M.S. reinforcement of R.C.C. works
Rolling shutters

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In the mid-section formula

The area of mid-sections is calculated by using mean depth
The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
All of these
The mean depth is the average of depths of two consecutive sections