Estimating and Costing The unit of measurement is per quintal for the following: M.S. reinforcement of R.C.C. works Rolling shutters Collapsible gates with rails Expanded metal wire netting M.S. reinforcement of R.C.C. works Rolling shutters Collapsible gates with rails Expanded metal wire netting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m Length of long wall out-to-out is 6.80 m All listed here The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m Length of long wall out-to-out is 6.80 m All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. All listed here Steps in deep excavation Site clearance Setting out of works All listed here Steps in deep excavation Site clearance Setting out of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Room area Courtyard area W' Area Wall thickness Room area Courtyard area W' Area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Liter for capacity Cubic metre for area Square meters for volume Meter for length Liter for capacity Cubic metre for area Square meters for volume Meter for length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 1.00 cum 3.00 cum 2.00 cum 4.00 cum 1.00 cum 3.00 cum 2.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP