Estimating and Costing

Estimating and Costing
The damp proof course (D.P.C.) is measured in

Meters
Cub. m
Sq. m
None of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While preparing a detailed estimate

Volume should be measured correct to 0.01 cum
Dimension should be measured correct to 0.01 m
All of these
Area should be measured correct to 0.01 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

0.274 m³
0.200 m³
0.295 m³
0.247 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

3.00 cum
2.00 cum
1.00 cum
4.00 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The minimum width of a septic tank is taken

75 cm
70 cm
90 cm
80 cm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

All listed here
Site clearance
Setting out of works
Steps in deep excavation

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑