Estimating and Costing The damp proof course (D.P.C.) is measured in None of these Sq. m Cub. m Meters None of these Sq. m Cub. m Meters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Both (B) and (C) Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Both (B) and (C) Ordinary cuttings up to 1 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of Cement concrete in foundation R.C.C. structure Hollow concrete block wall None of these Cement concrete in foundation R.C.C. structure Hollow concrete block wall None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Bottom of P trap W.C. Main soil pipe Top of P trap W.C. Side of water closet Bottom of P trap W.C. Main soil pipe Top of P trap W.C. Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.01 cum 0.02 cum 0.04 cum 0.03 cum 0.01 cum 0.02 cum 0.04 cum 0.03 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.025 0.05 0.04 0.02 0.025 0.05 0.04 0.02 ANSWER DOWNLOAD EXAMIANS APP