Estimating and Costing

Estimating and Costing
The damp proof course (D.P.C.) is measured in

Meters
Cub. m
Sq. m
None of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of steel work which is measured in sq.m, is

Rolling shutters
All listed here
Ventilators and glazing
Collapsible gates

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

1.00 m³
1.50 m³
1.25 m³
1.75 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In case of laying gullies, siphons, intercepting traps, the cost includes

All of these
Bed concreting
Connection to drains
Setting and laying

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

(6 + 18) chains
(6 + 12) chains
(6 + 15) chains
None of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The unit of measurement is per quintal for the following:

Rolling shutters
M.S. reinforcement of R.C.C. works
Expanded metal wire netting
Collapsible gates with rails

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑