Estimating and Costing The damp proof course (D.P.C.) is measured in Sq. m Meters None of these Cub. m Sq. m Meters None of these Cub. m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 1.5 m³ 2.5 m³ 3.5 m³ 5.0 m³ 1.5 m³ 2.5 m³ 3.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 4.0 m2 5.0 m2 1.5 m2 2.0 m2 4.0 m2 5.0 m2 1.5 m2 2.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: The total length of centre line of four walls is 20 m All listed here Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m All listed here Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 59 D 50 D 30 D 39 D 59 D 50 D 30 D 39 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 75 cm 70 cm 90 cm 80 cm 75 cm 70 cm 90 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP