Estimating and Costing The damp proof course (D.P.C.) is measured in Cub. m None of these Sq. m Meters Cub. m None of these Sq. m Meters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: Rolling shutters M.S. reinforcement of R.C.C. works Expanded metal wire netting Collapsible gates with rails Rolling shutters M.S. reinforcement of R.C.C. works Expanded metal wire netting Collapsible gates with rails ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs Wall panels All of these Floors Root slabs Wall panels All of these Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 ½ (Bd + Sd2) Bd + Sd2 B + d + Sd B × d - Sd1/2 ½ (Bd + Sd2) Bd + Sd2 B + d + Sd ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork Flooring, Wood work, Steel work All of these Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work All of these Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 75 cm to 80 cm 80 cm 70 cm 60 cm 75 cm to 80 cm 80 cm 70 cm 60 cm ANSWER DOWNLOAD EXAMIANS APP