Estimating and Costing The damp proof course (D.P.C.) is measured in Meters Cub. m Sq. m None of these Meters Cub. m Sq. m None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Rolling shutters All listed here Ventilators and glazing Collapsible gates Rolling shutters All listed here Ventilators and glazing Collapsible gates ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.00 m³ 1.50 m³ 1.25 m³ 1.75 m³ 1.00 m³ 1.50 m³ 1.25 m³ 1.75 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes All of these Bed concreting Connection to drains Setting and laying All of these Bed concreting Connection to drains Setting and laying ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is (6 + 18) chains (6 + 12) chains (6 + 15) chains None of these (6 + 18) chains (6 + 12) chains (6 + 15) chains None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: Rolling shutters M.S. reinforcement of R.C.C. works Expanded metal wire netting Collapsible gates with rails Rolling shutters M.S. reinforcement of R.C.C. works Expanded metal wire netting Collapsible gates with rails ANSWER DOWNLOAD EXAMIANS APP