Estimating and Costing The damp proof course (D.P.C.) is measured in None of these Cub. m Sq. m Meters None of these Cub. m Sq. m Meters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Height, length, breadth Breadth, length, height Length, breadth, height None of these Height, length, breadth Breadth, length, height Length, breadth, height None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Partly in excavation and partly in embankment Fully in embankment Fully in excavation All of these Partly in excavation and partly in embankment Fully in embankment Fully in excavation All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.01 cum 0.04 cum 0.02 cum 0.03 cum 0.01 cum 0.04 cum 0.02 cum 0.03 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Both (B) and (C) Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Both (B) and (C) Ordinary cuttings up to 1 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 1000 m3 2000 m3 500 m3 1500 m3 1000 m3 2000 m3 500 m3 1500 m3 ANSWER DOWNLOAD EXAMIANS APP