Estimating and Costing The damp proof course (D.P.C.) is measured in Meters Cub. m None of these Sq. m Meters Cub. m None of these Sq. m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 10 sqm 2.5 sqm 7.5 sqm 5.0 sqm 10 sqm 2.5 sqm 7.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 30 D 59 D 50 D 39 D 30 D 59 D 50 D 39 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 14° 12° 8° 10° 14° 12° 8° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Surface dressing up to 15 cm depths Both (B) and (C) Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Both (B) and (C) Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 Bd + Sd2 ½ (Bd + Sd2) B + d + Sd B × d - Sd1/2 Bd + Sd2 ½ (Bd + Sd2) B + d + Sd ANSWER DOWNLOAD EXAMIANS APP