Estimating and Costing Pick up the correct statement in case of water supply. All of these Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality All of these Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Circular buildings All of these Hexagonal buildings Octagonal buildings Circular buildings All of these Hexagonal buildings Octagonal buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Steps in deep excavation Site clearance All listed here Setting out of works Steps in deep excavation Site clearance All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Concrete Jeffries P.C. (Damp proof course) R.C. Chhajja Form works Concrete Jeffries P.C. (Damp proof course) R.C. Chhajja Form works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of All of these Honey comb brick work Brick flat soling Half brick walls or the partition All of these Honey comb brick work Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work All of these Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work All of these ANSWER DOWNLOAD EXAMIANS APP