Estimating and Costing Referring of given figure, pick up the correct statement from the following: The total length of centre line of four walls is 20 m Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m All listed here The total length of centre line of four walls is 20 m Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Bolts All listed here Cleats Brackets Bolts All listed here Cleats Brackets ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at 30 meters apart Right angle to the centre line Intermediate points having abrupt change in gradient All of these 30 meters apart Right angle to the centre line Intermediate points having abrupt change in gradient All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Availability of materials All of these Quantity of the materials Transportation of materials Availability of materials All of these Quantity of the materials Transportation of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 40 minutes 20 minutes 30 minutes 25 minutes 40 minutes 20 minutes 30 minutes 25 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.04 cum 0.02 cum 0.03 cum 0.01 cum 0.04 cum 0.02 cum 0.03 cum 0.01 cum ANSWER DOWNLOAD EXAMIANS APP