Estimating and Costing Referring of given figure, pick up the correct statement from the following: Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m Length of long wall out-to-out is 6.80 m All listed here Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m Length of long wall out-to-out is 6.80 m All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Wall panels Floors Root slabs All of these Wall panels Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The plinth area of a building not includes Area of the walls at the floor level Area of cantilevered porch Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level Area of cantilevered porch Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.00 m³ 1.75 m³ 1.50 m³ 1.25 m³ 1.00 m³ 1.75 m³ 1.50 m³ 1.25 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 40 minutes 20 minutes 30 minutes 25 minutes 40 minutes 20 minutes 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is None of these Length, breadth, height Height, breadth, length Breadth, length, height None of these Length, breadth, height Height, breadth, length Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP