Estimating and Costing Referring of given figure, pick up the correct statement from the following: Length of long wall out-to-out is 6.80 m All listed here Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m Length of long wall out-to-out is 6.80 m All listed here Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in Cub. m None of these Meters Sq. m Cub. m None of these Meters Sq. m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.247 m³ 0.295 m³ 0.200 m³ 0.274 m³ 0.247 m³ 0.295 m³ 0.200 m³ 0.274 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Hexagonal buildings All of these Circular buildings Octagonal buildings Hexagonal buildings All of these Circular buildings Octagonal buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 1.00 cum 3.00 cum 2.00 cum 4.00 cum 1.00 cum 3.00 cum 2.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is All of these Availability of materials Transportation of materials Quantity of the materials All of these Availability of materials Transportation of materials Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP