Estimating and Costing

Estimating and Costing
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

1.25 m³
1.50 m³
1.00 m³
1.75 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of steel work which is measured in sq.m, is

Rolling shutters
Collapsible gates
All listed here
Ventilators and glazing

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of an item of work depends on

All of these
Specifications of works
Specifications of materials
Proportion of mortar

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

6.0 sq m
4.0 sq m
2.5 sq m
8.0 sq m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Anti-siphonage pipe is connected to

Top of P trap W.C.
Main soil pipe
Bottom of P trap W.C.
Side of water closet

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
According to ISI method of measurement, the order of the sequence is

Height, length, breadth
Length, breadth, height
Breadth, length, height
None of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑