Estimating and Costing The weight of an item is measured correct to nearest 0.25 kg 0.75 kg 1.00 kg 0.50 kg 0.25 kg 0.75 kg 1.00 kg 0.50 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.04 sqm 0.03 sqm 0.02 sqm 0.01 sqm 0.04 sqm 0.03 sqm 0.02 sqm 0.01 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 12° 8° 14° 10° 12° 8° 14° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Quantity of the materials Transportation of materials All of these Availability of materials Quantity of the materials Transportation of materials All of these Availability of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Setting and laying All of these Connection to drains Bed concreting Setting and laying All of these Connection to drains Bed concreting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula All of these Trapezoidal formula Prismoidal formula Mid-section formula All of these Trapezoidal formula Prismoidal formula ANSWER DOWNLOAD EXAMIANS APP