Estimating and Costing The weight of an item is measured correct to nearest 1.00 kg 0.50 kg 0.75 kg 0.25 kg 1.00 kg 0.50 kg 0.75 kg 0.25 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Cutting through walls and floors are included with the item Pipes are classified according to their sizes and quality Pipes laid in trenches and pipes fixed to walls are measured separately All of these Cutting through walls and floors are included with the item Pipes are classified according to their sizes and quality Pipes laid in trenches and pipes fixed to walls are measured separately All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 12° 8° 10° 14° 12° 8° 10° 14° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are All of these Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing All of these Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Lavatory basins Flushing pipes All listed here Water closets Lavatory basins Flushing pipes All listed here Water closets ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Wall thickness Room area Courtyard area W' Area Wall thickness Room area Courtyard area W' Area ANSWER DOWNLOAD EXAMIANS APP