Estimating and Costing The weight of an item is measured correct to nearest 0.75 kg 1.00 kg 0.25 kg 0.50 kg 0.75 kg 1.00 kg 0.25 kg 0.50 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + 0.42 d L + (2 × 0.42 d) L - (0.42 d) L - (2 × 0.4 d) L + 0.42 d L + (2 × 0.42 d) L - (0.42 d) L - (2 × 0.4 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.02 0.025 0.04 0.05 0.02 0.025 0.04 0.05 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Courtyard area W' Area Room area Wall thickness Courtyard area W' Area Room area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3300 m³ 3225 m³ 3250 m³ 3275 m³ 3300 m³ 3225 m³ 3250 m³ 3275 m³ ANSWER DOWNLOAD EXAMIANS APP