Estimating and Costing The weight of an item is measured correct to nearest 0.50 kg 1.00 kg 0.75 kg 0.25 kg 0.50 kg 1.00 kg 0.75 kg 0.25 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is Bd + Sd2 B + d + Sd ½ (Bd + Sd2) B × d - Sd1/2 Bd + Sd2 B + d + Sd ½ (Bd + Sd2) B × d - Sd1/2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 8.0 sq m 6.0 sq m 4.0 sq m 2.5 sq m 8.0 sq m 6.0 sq m 4.0 sq m 2.5 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. All listed here Site clearance Steps in deep excavation Setting out of works All listed here Site clearance Steps in deep excavation Setting out of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 1 0.25 0.5 0.75 1 0.25 0.5 0.75 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.295 m³ 0.274 m³ 0.247 m³ 0.200 m³ 0.295 m³ 0.274 m³ 0.247 m³ 0.200 m³ ANSWER DOWNLOAD EXAMIANS APP