Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 10 cm 20 cm 15 cm None of these 10 cm 20 cm 15 cm None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 1.5 m2 5.0 m2 4.0 m2 2.0 m2 1.5 m2 5.0 m2 4.0 m2 2.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Proportion of mortar Specifications of materials Specifications of works All of these Proportion of mortar Specifications of materials Specifications of works All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is d × d × s L.D √(1 + s²) 2 L.D √(1 + s²) √[d² × (ds)²] d × d × s L.D √(1 + s²) 2 L.D √(1 + s²) √[d² × (ds)²] ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 10° 12° 8° 14° 10° 12° 8° 14° ANSWER DOWNLOAD EXAMIANS APP