Estimating and Costing

Estimating and Costing
The expected out turn of 2.5 cm cement concrete floor per mansion per day

5.0 sqm
7.5 sqm
10 sqm
2.5 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of payment is made for 100 cu m (per % cu m) in case of

Excavation in trenches for foundation
All of these
Rock cutting
Earth work in excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

0.02
0.05
0.025
0.04

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

12°
8°
10°
14°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of the brick structure measured in sq.m, is

Broken glass coping
Brick work in arches
Reinforced brick work
Brick edging

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Courtyard area
Room area
W' Area
Wall thickness

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑