Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.75 m³ 1.25 m³ 1.50 m³ 1.00 m³ 1.75 m³ 1.25 m³ 1.50 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed In thin slabs, 12 mm minimum or diameter of the bar whichever is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more In thin slabs, 12 mm minimum or diameter of the bar whichever is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 4.00 cum 3.00 cum 2.00 cum 1.00 cum 4.00 cum 3.00 cum 2.00 cum 1.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 40 minutes 30 minutes 20 minutes 25 minutes 40 minutes 30 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of works Specifications of materials Proportion of mortar All of these Specifications of works Specifications of materials Proportion of mortar All of these ANSWER DOWNLOAD EXAMIANS APP