Estimating and Costing

Estimating and Costing
The expected out turn of 2.5 cm cement concrete floor per mansion per day

5.0 sqm
2.5 sqm
10 sqm
7.5 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Referring of given figure, pick up the correct statement from the following:

Length of short walls in-to-in is 3.20 m
All listed here
The total length of centre line of four walls is 20 m
Length of long wall out-to-out is 6.80 m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

3.5 m³
5.0 m³
2.5 m³
1.5 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While preparing a detailed estimate

Area should be measured correct to 0.01 sqm
All of these
Volume should be measured correct to 0.01 cum
Dimension should be measured correct to 0.01 m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Surface excavation
Cutting
Excavation
Surface dressing

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

0.05
0.02
0.025
0.04

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑