Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 10 sqm 7.5 sqm 2.5 sqm 5.0 sqm 10 sqm 7.5 sqm 2.5 sqm 5.0 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 70 cm 80 cm 75 cm to 80 cm 60 cm 70 cm 80 cm 75 cm to 80 cm 60 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula Prismoidal formula All of these Trapezoidal formula Mid-section formula Prismoidal formula All of these Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Excavation Surface dressing Cutting Surface excavation Excavation Surface dressing Cutting Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Cleats All listed here Brackets Bolts Cleats All listed here Brackets Bolts ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 59 D 30 D 39 D 50 D 59 D 30 D 39 D 50 D ANSWER DOWNLOAD EXAMIANS APP