Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Ordinary cuttings up to 1 m Surface excavation up to 30 cm depths Surface dressing up to 15 cm depths Both (B) and (C) Ordinary cuttings up to 1 m Surface excavation up to 30 cm depths Surface dressing up to 15 cm depths Both (B) and (C) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Brick work in arches Reinforced brick work Broken glass coping Brick edging Brick work in arches Reinforced brick work Broken glass coping Brick edging ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in excavation All of these Partly in excavation and partly in embankment Fully in embankment Fully in excavation All of these Partly in excavation and partly in embankment Fully in embankment ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is None of these Breadth, length, height Length, breadth, height Height, breadth, length None of these Breadth, length, height Length, breadth, height Height, breadth, length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 70 cm 75 cm 90 cm 80 cm 70 cm 75 cm 90 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.02 0.025 0.04 0.05 0.02 0.025 0.04 ANSWER DOWNLOAD EXAMIANS APP