Estimating and Costing The cross-sections for a highway is taken at All of these 30 meters apart Intermediate points having abrupt change in gradient Right angle to the centre line All of these 30 meters apart Intermediate points having abrupt change in gradient Right angle to the centre line ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for Ball valves Bib-cocks All of these Stop-cocks Ball valves Bib-cocks All of these Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Length, breadth, height Height, length, breadth None of these Breadth, length, height Length, breadth, height Height, length, breadth None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 2.5 sqm 10 sqm 7.5 sqm 5.0 sqm 2.5 sqm 10 sqm 7.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 30 minutes 40 minutes 20 minutes 25 minutes 30 minutes 40 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Both (B) and (C) Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Both (B) and (C) Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths ANSWER DOWNLOAD EXAMIANS APP