Estimating and Costing The cross-sections for a highway is taken at 30 meters apart All of these Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these Intermediate points having abrupt change in gradient Right angle to the centre line ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Wall thickness Room area W' Area Courtyard area Wall thickness Room area W' Area Courtyard area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Cubic metre for area Meter for length Square meters for volume Liter for capacity Cubic metre for area Meter for length Square meters for volume Liter for capacity ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3300 m³ 3225 m³ 3250 m³ 3275 m³ 3300 m³ 3225 m³ 3250 m³ 3275 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.25 m³ 1.00 m³ 1.50 m³ 1.75 m³ 1.25 m³ 1.00 m³ 1.50 m³ 1.75 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Quantity of the materials Availability of materials Transportation of materials All of these Quantity of the materials Availability of materials Transportation of materials All of these ANSWER DOWNLOAD EXAMIANS APP