Estimating and Costing The cross-sections for a highway is taken at Right angle to the centre line All of these Intermediate points having abrupt change in gradient 30 meters apart Right angle to the centre line All of these Intermediate points having abrupt change in gradient 30 meters apart ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 14° 8° 10° 12° 14° 8° 10° 12° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 2.0 m2 4.0 m2 5.0 m2 1.5 m2 2.0 m2 4.0 m2 5.0 m2 1.5 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula Trapezoidal formula All of these Prismoidal formula Mid-section formula Trapezoidal formula All of these Prismoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Liter for capacity Cubic metre for area Meter for length Square meters for volume Liter for capacity Cubic metre for area Meter for length Square meters for volume ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 100 mm 175 mm 150 mm 200 mm 100 mm 175 mm 150 mm 200 mm ANSWER DOWNLOAD EXAMIANS APP