Estimating and Costing The cross-sections for a highway is taken at Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.25 m³ 1.00 m³ 1.75 m³ 1.50 m³ 1.25 m³ 1.00 m³ 1.75 m³ 1.50 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Broken glass coping Brick edging Brick work in arches Reinforced brick work Broken glass coping Brick edging Brick work in arches Reinforced brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: It is provided a cleaning eye at the top of the trap The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided in between the lower end of the house drain and the street sewer The water seal is less than that of ordinary traps It is provided a cleaning eye at the top of the trap The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided in between the lower end of the house drain and the street sewer The water seal is less than that of ordinary traps ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Bed concreting All of these Connection to drains Setting and laying Bed concreting All of these Connection to drains Setting and laying ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 39 D 30 D 59 D 50 D 39 D 30 D 59 D 50 D ANSWER DOWNLOAD EXAMIANS APP