Estimating and Costing The cross-sections for a highway is taken at Right angle to the centre line 30 meters apart All of these Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these Intermediate points having abrupt change in gradient ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Master trap Intercepting trap All listed here Interception manhole Master trap Intercepting trap All listed here Interception manhole ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 15 cm None of these 10 cm 20 cm 15 cm None of these 10 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Both (B) and (C) Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Both (B) and (C) Surface dressing up to 15 cm depths ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of P.C. (Damp proof course) R.C. Chhajja Form works Concrete Jeffries P.C. (Damp proof course) R.C. Chhajja Form works Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP