Estimating and Costing The cross-sections for a highway is taken at 30 meters apart Right angle to the centre line Intermediate points having abrupt change in gradient All of these 30 meters apart Right angle to the centre line Intermediate points having abrupt change in gradient All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 1.5 m2 4.0 m2 5.0 m2 2.0 m2 1.5 m2 4.0 m2 5.0 m2 2.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.00 m³ 1.25 m³ 1.75 m³ 1.50 m³ 1.00 m³ 1.25 m³ 1.75 m³ 1.50 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Intercepting trap Interception manhole All listed here Master trap Intercepting trap Interception manhole All listed here Master trap ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.03 sqm 0.04 sqm 0.02 sqm 0.01 sqm 0.03 sqm 0.04 sqm 0.02 sqm 0.01 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Reinforced brick work Broken glass coping Brick work in arches Brick edging Reinforced brick work Broken glass coping Brick work in arches Brick edging ANSWER DOWNLOAD EXAMIANS APP