Estimating and Costing The cross-sections for a highway is taken at All of these Right angle to the centre line Intermediate points having abrupt change in gradient 30 meters apart All of these Right angle to the centre line Intermediate points having abrupt change in gradient 30 meters apart ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Main soil pipe Bottom of P trap W.C. Side of water closet Top of P trap W.C. Main soil pipe Bottom of P trap W.C. Side of water closet Top of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 2.0 m2 1.5 m2 5.0 m2 4.0 m2 2.0 m2 1.5 m2 5.0 m2 4.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Broken glass coping Brick work in arches Brick edging Reinforced brick work Broken glass coping Brick work in arches Brick edging Reinforced brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Wall thickness W' Area Courtyard area Room area Wall thickness W' Area Courtyard area Room area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Flushing pipes Lavatory basins Water closets All listed here Flushing pipes Lavatory basins Water closets All listed here ANSWER DOWNLOAD EXAMIANS APP