Estimating and Costing Pick up the item of work not included in the plinth area estimate Courtyard area Room area Wall thickness W' Area Courtyard area Room area Wall thickness W' Area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: Expanded metal wire netting M.S. reinforcement of R.C.C. works Collapsible gates with rails Rolling shutters Expanded metal wire netting M.S. reinforcement of R.C.C. works Collapsible gates with rails Rolling shutters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Length, breadth, height None of these Height, length, breadth Breadth, length, height Length, breadth, height None of these Height, length, breadth ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 2.5 sqm 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm 5.0 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: It is provided a cleaning eye at the top of the trap The water seal is less than that of ordinary traps The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided in between the lower end of the house drain and the street sewer It is provided a cleaning eye at the top of the trap The water seal is less than that of ordinary traps The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided in between the lower end of the house drain and the street sewer ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 30 minutes 20 minutes 40 minutes 25 minutes 30 minutes 20 minutes 40 minutes ANSWER DOWNLOAD EXAMIANS APP