Pick up the item of work not included in the plinth area estimate

Room area
Courtyard area
W' Area
Wall thickness

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

All listed here
Setting out of works
Site clearance
Steps in deep excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Referring of given figure, pick up the correct statement from the following:

Length of short walls in-to-in is 3.20 m
Length of long wall out-to-out is 6.80 m
The total length of centre line of four walls is 20 m
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Berms are provided in canals if these are

Fully in embankment
Partly in excavation and partly in embankment
All of these
Fully in excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of steel work which is measured in sq.m, is

Collapsible gates
All listed here
Ventilators and glazing
Rolling shutters

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

3.00 cum
4.00 cum
1.00 cum
2.00 cum

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑