Pick up the item of work not included in the plinth area estimate

W' Area
Courtyard area
Room area
Wall thickness

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

Bd + Sd2
½ (Bd + Sd2)
B × d - Sd1/2
B + d + Sd

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The cross-sections for a highway is taken at

30 meters apart
Intermediate points having abrupt change in gradient
Right angle to the centre line
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While estimating the qualities for the construction of a building, the correct metric unit is

Cubic metre for area
Liter for capacity
Square meters for volume
Meter for length

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

2.5 sq m
6.0 sq m
8.0 sq m
4.0 sq m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Anti-siphonage pipe is connected to

Side of water closet
Main soil pipe
Bottom of P trap W.C.
Top of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑