Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Wall thickness
Room area
Courtyard area
W' Area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of half brick partition wall per mason per day is

4.0 m2
2.0 m2
1.5 m2
5.0 m2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is

d × d × s
√[d² × (ds)²]
L.D √(1 + s²)
2 L.D √(1 + s²)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

½ (Bd + Sd2)
B + d + Sd
Bd + Sd2
B × d - Sd1/2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

39 D
30 D
59 D
50 D

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The brick work is not measured in cu m in case of

Half brick wall
One or more than one brick wall
Brick work in arches
Reinforced brick work

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑