Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Room area Wall thickness Courtyard area W' Area Room area Wall thickness Courtyard area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 14° 12° 10° 8° 14° 12° 10° 8° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Columns, lintels, copings Wall facing Building work (A) and (B) of the above Columns, lintels, copings Wall facing Building work (A) and (B) of the above ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd ½ (Bd + Sd2) B × d - Sd1/2 Bd + Sd2 B + d + Sd ½ (Bd + Sd2) B × d - Sd1/2 Bd + Sd2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 2.5 m³ 1.5 m³ 3.5 m³ 5.0 m³ 2.5 m³ 1.5 m³ 3.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at 30 meters apart All of these Right angle to the centre line Intermediate points having abrupt change in gradient 30 meters apart All of these Right angle to the centre line Intermediate points having abrupt change in gradient ANSWER DOWNLOAD EXAMIANS APP