Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Courtyard area
Room area
Wall thickness
W' Area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.94 m³
0.90 m³
1.00 m³
0.98 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

One fourth breadth of wall on each side
Half breadth of wall on each side
None of these
Breadth of the wall

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The volume is measured correct to the nearest

0.02 cum
0.03 cum
0.01 cum
0.04 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is

d × d × s
L.D √(1 + s²)
2 L.D √(1 + s²)
√[d² × (ds)²]

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Referring of given figure, pick up the correct statement from the following:

Length of long wall out-to-out is 6.80 m
All listed here
The total length of centre line of four walls is 20 m
Length of short walls in-to-in is 3.20 m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑