Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Wall thickness
Room area
W' Area
Courtyard area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

All of these
At every 30 m intervals
At every change of direction
At every change of gradient

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 2.5 cm cement concrete floor per mansion per day

10 sqm
7.5 sqm
2.5 sqm
5.0 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

2000 m3
1000 m3
500 m3
1500 m3

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is

L.D √(1 + s²)
√[d² × (ds)²]
d × d × s
2 L.D √(1 + s²)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

Bolts
Brackets
Cleats
All listed here

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑