Estimating and Costing Pick up the item of work not included in the plinth area estimate Room area Courtyard area W' Area Wall thickness Room area Courtyard area W' Area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. All listed here Setting out of works Site clearance Steps in deep excavation All listed here Setting out of works Site clearance Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: Length of short walls in-to-in is 3.20 m Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m All listed here Length of short walls in-to-in is 3.20 m Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in embankment Partly in excavation and partly in embankment All of these Fully in excavation Fully in embankment Partly in excavation and partly in embankment All of these Fully in excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Collapsible gates All listed here Ventilators and glazing Rolling shutters Collapsible gates All listed here Ventilators and glazing Rolling shutters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 4.00 cum 1.00 cum 2.00 cum 3.00 cum 4.00 cum 1.00 cum 2.00 cum ANSWER DOWNLOAD EXAMIANS APP