Estimating and Costing Pick up the item of work not included in the plinth area estimate Wall thickness Courtyard area Room area W' Area Wall thickness Courtyard area Room area W' Area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 1 0.25 0.5 0.75 1 0.25 0.5 0.75 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 2.5 m³ 5.0 m³ 3.5 m³ 1.5 m³ 2.5 m³ 5.0 m³ 3.5 m³ 1.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 10° 12° 8° 14° 10° 12° 8° 14° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 2.5 sq m 8.0 sq m 4.0 sq m 6.0 sq m 2.5 sq m 8.0 sq m 4.0 sq m 6.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3225 m³ 3300 m³ 3275 m³ 3250 m³ 3225 m³ 3300 m³ 3275 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP