Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Room area Wall thickness Courtyard area W' Area Room area Wall thickness Courtyard area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line is worked out separately for different sections of walls of a building All of these The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line is worked out separately for different sections of walls of a building All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Reinforced brick work One or more than one brick wall Half brick wall Brick work in arches Reinforced brick work One or more than one brick wall Half brick wall Brick work in arches ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided a cleaning eye at the top of the trap The water seal is less than that of ordinary traps It is provided in between the lower end of the house drain and the street sewer The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided a cleaning eye at the top of the trap The water seal is less than that of ordinary traps It is provided in between the lower end of the house drain and the street sewer ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Steps in deep excavation Setting out of works All listed here Site clearance Steps in deep excavation Setting out of works All listed here Site clearance ANSWER DOWNLOAD EXAMIANS APP