Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Courtyard area
W' Area
Room area
Wall thickness

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The 'centre line method' is specially adopted for estimating

All of these
Circular buildings
Hexagonal buildings
Octagonal buildings

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

(6 + 12) chains
(6 + 18) chains
None of these
(6 + 15) chains

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

10°
12°
8°
14°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

1.00 cum
3.00 cum
4.00 cum
2.00 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

Bolts
All listed here
Cleats
Brackets

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑