Estimating and Costing Pick up the item of work not included in the plinth area estimate Room area W' Area Courtyard area Wall thickness Room area W' Area Courtyard area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Availability of materials Transportation of materials All of these Quantity of the materials Availability of materials Transportation of materials All of these Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of Hollow concrete block wall Cement concrete in foundation R.C.C. structure None of these Hollow concrete block wall Cement concrete in foundation R.C.C. structure None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja Form works P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja Form works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system All of these At every 30 m intervals At every change of direction At every change of gradient All of these At every 30 m intervals At every change of direction At every change of gradient ANSWER DOWNLOAD EXAMIANS APP