Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

W' Area
Room area
Courtyard area
Wall thickness

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

3.00 cum
4.00 cum
1.00 cum
2.00 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

1.20 liters for 15 users
1.80 liters for 5 to 10 users
All of these
1.35 for 20 users

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area is measured correct to the nearest

0.03 sqm
0.04 sqm
0.01 sqm
0.02 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The cross-sections for a highway is taken at

Intermediate points having abrupt change in gradient
30 meters apart
All of these
Right angle to the centre line

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While estimating the qualities for the construction of a building, the correct metric unit is

Square meters for volume
Meter for length
Cubic metre for area
Liter for capacity

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑