Estimating and Costing Pick up the item of work not included in the plinth area estimate Courtyard area Room area Wall thickness W' Area Courtyard area Room area Wall thickness W' Area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Height, breadth, length None of these Length, breadth, height Breadth, length, height Height, breadth, length None of these Length, breadth, height Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.20 liters for 15 users All of these 1.35 for 20 users 1.80 liters for 5 to 10 users 1.20 liters for 15 users All of these 1.35 for 20 users 1.80 liters for 5 to 10 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 2.5 m³ 5.0 m³ 3.5 m³ 1.5 m³ 2.5 m³ 5.0 m³ 3.5 m³ 1.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Brackets Cleats All listed here Bolts Brackets Cleats All listed here Bolts ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by All of these Prismoidal formula Trapezoidal formula Mid-section formula All of these Prismoidal formula Trapezoidal formula Mid-section formula ANSWER DOWNLOAD EXAMIANS APP