Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Courtyard area
W' Area
Wall thickness
Room area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

Breadth of the wall
One fourth breadth of wall on each side
None of these
Half breadth of wall on each side

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The detention period in a septic tank is assumed

40 minutes
30 minutes
25 minutes
20 minutes

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

0.295 m³
0.247 m³
0.200 m³
0.274 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Carpet area does not include the area of

All of these
Bath room and lavatory
Kitchen and pantry
The walls along with doors and other openings

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made for stone work in square metre in case of

Wall facing
Columns, lintels, copings
Building work
(A) and (B) of the above

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑