• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Room area
W' Area
Courtyard area
Wall thickness

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The main factor to be considered while preparing a detailed estimate, is

Availability of materials
Transportation of materials
All of these
Quantity of the materials

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

Setting out of works
Steps in deep excavation
All listed here
Site clearance

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made in square metre in case of

Hollow concrete block wall
Cement concrete in foundation
R.C.C. structure
None of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is not made in square meters in case of

P.C. (Damp proof course)
Concrete Jeffries
R.C. Chhajja
Form works

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

All of these
At every 30 m intervals
At every change of direction
At every change of gradient

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑