Estimating and Costing Pick up the item of work not included in the plinth area estimate Courtyard area W' Area Wall thickness Room area Courtyard area W' Area Wall thickness Room area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and Breadth of the wall One fourth breadth of wall on each side None of these Half breadth of wall on each side Breadth of the wall One fourth breadth of wall on each side None of these Half breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 40 minutes 30 minutes 25 minutes 20 minutes 40 minutes 30 minutes 25 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.295 m³ 0.247 m³ 0.200 m³ 0.274 m³ 0.295 m³ 0.247 m³ 0.200 m³ 0.274 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of All of these Bath room and lavatory Kitchen and pantry The walls along with doors and other openings All of these Bath room and lavatory Kitchen and pantry The walls along with doors and other openings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Wall facing Columns, lintels, copings Building work (A) and (B) of the above Wall facing Columns, lintels, copings Building work (A) and (B) of the above ANSWER DOWNLOAD EXAMIANS APP