Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Wall thickness Courtyard area Room area W' Area Wall thickness Courtyard area Room area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Meter for length Cubic metre for area Liter for capacity Square meters for volume Meter for length Cubic metre for area Liter for capacity Square meters for volume ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 1.5 m2 2.0 m2 4.0 m2 5.0 m2 1.5 m2 2.0 m2 4.0 m2 5.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Concrete Jeffries P.C. (Damp proof course) R.C. Chhajja Form works Concrete Jeffries P.C. (Damp proof course) R.C. Chhajja Form works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Site clearance Setting out of works All listed here Steps in deep excavation Site clearance Setting out of works All listed here Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP