Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Courtyard area Room area Wall thickness W' Area Courtyard area Room area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at 30 meters apart Intermediate points having abrupt change in gradient Right angle to the centre line All of these 30 meters apart Intermediate points having abrupt change in gradient Right angle to the centre line All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Cubic metre for area Liter for capacity Square meters for volume Meter for length Cubic metre for area Liter for capacity Square meters for volume Meter for length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 2.5 sq m 6.0 sq m 8.0 sq m 4.0 sq m 2.5 sq m 6.0 sq m 8.0 sq m 4.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Main soil pipe Bottom of P trap W.C. Top of P trap W.C. Side of water closet Main soil pipe Bottom of P trap W.C. Top of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP