Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system All of these At every change of gradient At every change of direction At every 30 m intervals All of these At every change of gradient At every change of direction At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 2.5 sqm 5.0 sqm 10 sqm 7.5 sqm 2.5 sqm 5.0 sqm 10 sqm 7.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Half brick wall Brick work in arches One or more than one brick wall Reinforced brick work Half brick wall Brick work in arches One or more than one brick wall Reinforced brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Columns, lintels, copings (A) and (B) of the above Building work Wall facing Columns, lintels, copings (A) and (B) of the above Building work Wall facing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 12° 10° 8° 14° 12° 10° 8° 14° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is (6 + 12) chains (6 + 18) chains (6 + 15) chains None of these (6 + 12) chains (6 + 18) chains (6 + 15) chains None of these ANSWER DOWNLOAD EXAMIANS APP