Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of gradient At every 30 m intervals At every change of direction All of these At every change of gradient At every 30 m intervals At every change of direction All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 1.00 cum 4.00 cum 2.00 cum 3.00 cum 1.00 cum 4.00 cum 2.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Liter for capacity Meter for length Square meters for volume Cubic metre for area Liter for capacity Meter for length Square meters for volume Cubic metre for area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 80 cm 70 cm 75 cm 90 cm 80 cm 70 cm 75 cm 90 cm ANSWER DOWNLOAD EXAMIANS APP