Estimating and Costing Anti-siphonage pipe is connected to Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Cubic metre for area Meter for length Square meters for volume Liter for capacity Cubic metre for area Meter for length Square meters for volume Liter for capacity ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface dressing Excavation Cutting Surface excavation Surface dressing Excavation Cutting Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Intercepting trap All listed here Master trap Interception manhole Intercepting trap All listed here Master trap Interception manhole ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 1.00 kg 0.25 kg 0.50 kg 0.75 kg 1.00 kg 0.25 kg 0.50 kg 0.75 kg ANSWER DOWNLOAD EXAMIANS APP