Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of One or more than one brick wall Brick work in arches Reinforced brick work Half brick wall One or more than one brick wall Brick work in arches Reinforced brick work Half brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of works Proportion of mortar All of these Specifications of materials Specifications of works Proportion of mortar All of these Specifications of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Meter for length Cubic metre for area Square meters for volume Liter for capacity Meter for length Cubic metre for area Square meters for volume Liter for capacity ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 0.50 kg 0.75 kg 0.25 kg 1.00 kg 0.50 kg 0.75 kg 0.25 kg 1.00 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The mid-area of a pyramid is half the average area of the ends All listed here The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The mid-area of a pyramid is half the average area of the ends All listed here ANSWER DOWNLOAD EXAMIANS APP