Estimating and Costing

Estimating and Costing
Anti-siphonage pipe is connected to

Top of P trap W.C.
Main soil pipe
Bottom of P trap W.C.
Side of water closet

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

1.00 cum
4.00 cum
3.00 cum
2.00 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

Cleats
All listed here
Brackets
Bolts

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

10°
12°
8°
14°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made for stone work in square metre in case of

Wall facing
Columns, lintels, copings
Building work
(A) and (B) of the above

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of steel work which is measured in sq.m, is

Ventilators and glazing
All listed here
Collapsible gates
Rolling shutters

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑