Estimating and Costing

Estimating and Costing
Anti-siphonage pipe is connected to

Bottom of P trap W.C.
Main soil pipe
Side of water closet
Top of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While estimating the qualities for the construction of a building, the correct metric unit is

Cubic metre for area
Meter for length
Square meters for volume
Liter for capacity

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Surface dressing
Excavation
Cutting
Surface excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

All listed here
Site clearance
Setting out of works
Steps in deep excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The trap which is provided to disconnect the house drain from the street sewer is called

Intercepting trap
All listed here
Master trap
Interception manhole

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The weight of an item is measured correct to nearest

1.00 kg
0.25 kg
0.50 kg
0.75 kg

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑