Estimating and Costing

Estimating and Costing
Anti-siphonage pipe is connected to

Main soil pipe
Bottom of P trap W.C.
Top of P trap W.C.
Side of water closet

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

1.00 m³
0.94 m³
0.90 m³
0.98 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While preparing a detailed estimate

Area should be measured correct to 0.01 sqm
Volume should be measured correct to 0.01 cum
Dimension should be measured correct to 0.01 m
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The main factor to be considered while preparing a detailed estimate, is

All of these
Availability of materials
Quantity of the materials
Transportation of materials

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

14°
12°
10°
8°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

1000 m3
500 m3
1500 m3
2000 m3

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑