Estimating and Costing

Estimating and Costing
Anti-siphonage pipe is connected to

Top of P trap W.C.
Bottom of P trap W.C.
Side of water closet
Main soil pipe

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

One fourth breadth of wall on each side
None of these
Breadth of the wall
Half breadth of wall on each side

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While preparing a detailed estimate

Volume should be measured correct to 0.01 cum
All of these
Area should be measured correct to 0.01 sqm
Dimension should be measured correct to 0.01 m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

3.00 cum
2.00 cum
4.00 cum
1.00 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 2.5 cm cement concrete floor per mansion per day

10 sqm
2.5 sqm
7.5 sqm
5.0 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The order of booking dimensions is

None of these
Height, breadth, length
Length, breadth, height
Breadth, length, height

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑