Estimating and Costing

Estimating and Costing
Anti-siphonage pipe is connected to

Side of water closet
Top of P trap W.C.
Main soil pipe
Bottom of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Surface dressing
Cutting
Surface excavation
Excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Cost of fittings and their fixing is specified for the following sanitary fittings

Water closets
Flushing pipes
Lavatory basins
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is

d × d × s
L.D √(1 + s²)
√[d² × (ds)²]
2 L.D √(1 + s²)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

0.247 m³
0.200 m³
0.274 m³
0.295 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

4.00 cum
1.00 cum
3.00 cum
2.00 cum

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑