Anti-siphonage pipe is connected to

Main soil pipe
Side of water closet
Top of P trap W.C.
Bottom of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

1.5 m³
3.5 m³
5.0 m³
2.5 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

B + d + Sd
B × d - Sd1/2
½ (Bd + Sd2)
Bd + Sd2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made in square metre in case of

Hollow concrete block wall
R.C.C. structure
None of these
Cement concrete in foundation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the excavation where measurements are made in square meters for payment.

Both (B) and (C)
Ordinary cuttings up to 1 m
Surface dressing up to 15 cm depths
Surface excavation up to 30 cm depths

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The floor area includes the area of the balcony up to

0.25
0.75
0.5
1

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑