Estimating and Costing Anti-siphonage pipe is connected to Bottom of P trap W.C. Top of P trap W.C. Main soil pipe Side of water closet Bottom of P trap W.C. Top of P trap W.C. Main soil pipe Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm 20 cm x 10 cm x 10 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm 20 cm x 10 cm x 10 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on All of these Specifications of materials Specifications of works Proportion of mortar All of these Specifications of materials Specifications of works Proportion of mortar ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: Length of long wall out-to-out is 6.80 m All listed here The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m Length of long wall out-to-out is 6.80 m All listed here The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Length, breadth, height Height, length, breadth None of these Breadth, length, height Length, breadth, height Height, length, breadth None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 2.0 m2 4.0 m2 5.0 m2 1.5 m2 2.0 m2 4.0 m2 5.0 m2 1.5 m2 ANSWER DOWNLOAD EXAMIANS APP