Estimating and Costing Anti-siphonage pipe is connected to Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The correct Prismoidal formula for volume is D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] D/6 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas] D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] D/6 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas] D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 0.50 kg 0.25 kg 0.75 kg 1.00 kg 0.50 kg 0.25 kg 0.75 kg 1.00 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is d × d × s L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) d × d × s L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Excavation in trenches for foundation Earth work in excavation Rock cutting All of these Excavation in trenches for foundation Earth work in excavation Rock cutting All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and One fourth breadth of wall on each side None of these Breadth of the wall Half breadth of wall on each side One fourth breadth of wall on each side None of these Breadth of the wall Half breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP