Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Bottom of P trap W.C. Top of P trap W.C. Main soil pipe Side of water closet Bottom of P trap W.C. Top of P trap W.C. Main soil pipe ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work All of these Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) d × d × s √[d² × (ds)²] L.D √(1 + s²) 2 L.D √(1 + s²) d × d × s √[d² × (ds)²] L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for All of these Ball valves Bib-cocks Stop-cocks All of these Ball valves Bib-cocks Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of All of these Earth work in excavation Rock cutting Excavation in trenches for foundation All of these Earth work in excavation Rock cutting Excavation in trenches for foundation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Partly in excavation and partly in embankment All of these Fully in excavation Fully in embankment Partly in excavation and partly in embankment All of these Fully in excavation Fully in embankment ANSWER DOWNLOAD EXAMIANS APP