Anti-siphonage pipe is connected to

Main soil pipe
Side of water closet
Bottom of P trap W.C.
Top of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended

100 mm
150 mm
175 mm
200 mm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While estimating the qualities for the construction of a building, the correct metric unit is

Cubic metre for area
Square meters for volume
Liter for capacity
Meter for length

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The brick work is measured in sq metre, in case of

Half brick walls or the partition
All of these
Honey comb brick work
Brick flat soling

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

1.5 m³
5.0 m³
2.5 m³
3.5 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of an item of work depends on

Specifications of works
All of these
Specifications of materials
Proportion of mortar

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑