Estimating and Costing

Estimating and Costing
Anti-siphonage pipe is connected to

Main soil pipe
Top of P trap W.C.
Bottom of P trap W.C.
Side of water closet

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

1.25 m³
1.50 m³
1.00 m³
1.75 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

14°
12°
8°
10°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

Setting out of works
Steps in deep excavation
All listed here
Site clearance

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The height of the sink of wash basin above floor level is kept

60 cm
75 cm to 80 cm
70 cm
80 cm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made in square metre in case of

None of these
Hollow concrete block wall
R.C.C. structure
Cement concrete in foundation

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑