Estimating and Costing Anti-siphonage pipe is connected to Main soil pipe Bottom of P trap W.C. Side of water closet Top of P trap W.C. Main soil pipe Bottom of P trap W.C. Side of water closet Top of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 26,000 m³ 26,500 m³ 27,000 m³ 27,500 m³ 26,000 m³ 26,500 m³ 27,000 m³ 27,500 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Half brick wall Reinforced brick work Brick work in arches One or more than one brick wall Half brick wall Reinforced brick work Brick work in arches One or more than one brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Surface excavation Surface dressing Excavation Cutting Surface excavation Surface dressing Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of gradient All of these At every change of direction At every 30 m intervals At every change of gradient All of these At every change of direction At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Liter for capacity Cubic metre for area Square meters for volume Meter for length Liter for capacity Cubic metre for area Square meters for volume Meter for length ANSWER DOWNLOAD EXAMIANS APP