Estimating and Costing Anti-siphonage pipe is connected to Top of P trap W.C. Main soil pipe Bottom of P trap W.C. Side of water closet Top of P trap W.C. Main soil pipe Bottom of P trap W.C. Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 1.00 cum 4.00 cum 3.00 cum 2.00 cum 1.00 cum 4.00 cum 3.00 cum 2.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Cleats All listed here Brackets Bolts Cleats All listed here Brackets Bolts ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 10° 12° 8° 14° 10° 12° 8° 14° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Wall facing Columns, lintels, copings Building work (A) and (B) of the above Wall facing Columns, lintels, copings Building work (A) and (B) of the above ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Ventilators and glazing All listed here Collapsible gates Rolling shutters Ventilators and glazing All listed here Collapsible gates Rolling shutters ANSWER DOWNLOAD EXAMIANS APP