Estimating and Costing Anti-siphonage pipe is connected to Main soil pipe Bottom of P trap W.C. Top of P trap W.C. Side of water closet Main soil pipe Bottom of P trap W.C. Top of P trap W.C. Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 10° 14° 12° 8° 10° 14° 12° 8° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of All of these Excavation in trenches for foundation Rock cutting Earth work in excavation All of these Excavation in trenches for foundation Rock cutting Earth work in excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The end sections are parallel planes All listed here The mid-area of a pyramid is half the average area of the ends The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The end sections are parallel planes All listed here The mid-area of a pyramid is half the average area of the ends The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Intercepting trap Interception manhole All listed here Master trap Intercepting trap Interception manhole All listed here Master trap ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries Form works R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries Form works ANSWER DOWNLOAD EXAMIANS APP