Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.025 0.04 0.02 0.05 0.025 0.04 0.02 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Excavation Surface dressing Surface excavation Cutting Excavation Surface dressing Surface excavation Cutting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Setting and laying All of these Connection to drains Bed concreting Setting and laying All of these Connection to drains Bed concreting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of Hollow concrete block wall None of these Cement concrete in foundation R.C.C. structure Hollow concrete block wall None of these Cement concrete in foundation R.C.C. structure ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 12° 14° 8° 10° 12° 14° 8° 10° ANSWER DOWNLOAD EXAMIANS APP