Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Excavation Surface dressing Surface excavation Cutting Excavation Surface dressing Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken All of these 1.80 liters for 5 to 10 users 1.35 for 20 users 1.20 liters for 15 users All of these 1.80 liters for 5 to 10 users 1.35 for 20 users 1.20 liters for 15 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Top of P trap W.C. Main soil pipe Bottom of P trap W.C. Side of water closet Top of P trap W.C. Main soil pipe Bottom of P trap W.C. Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and None of these Breadth of the wall Half breadth of wall on each side One fourth breadth of wall on each side None of these Breadth of the wall Half breadth of wall on each side One fourth breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 5.0 m2 1.5 m2 2.0 m2 4.0 m2 5.0 m2 1.5 m2 2.0 m2 4.0 m2 ANSWER DOWNLOAD EXAMIANS APP