Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface dressing Excavation Cutting Surface excavation Surface dressing Excavation Cutting Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Connection to drains All of these Bed concreting Setting and laying Connection to drains All of these Bed concreting Setting and laying ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 0.75 kg 0.50 kg 0.25 kg 1.00 kg 0.75 kg 0.50 kg 0.25 kg 1.00 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.35 for 20 users All of these 1.80 liters for 5 to 10 users 1.20 liters for 15 users 1.35 for 20 users All of these 1.80 liters for 5 to 10 users 1.20 liters for 15 users ANSWER DOWNLOAD EXAMIANS APP