Estimating and Costing The height of the sink of wash basin above floor level is kept 60 cm 75 cm to 80 cm 70 cm 80 cm 60 cm 75 cm to 80 cm 70 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 1000 m3 500 m3 2000 m3 1500 m3 1000 m3 500 m3 2000 m3 1500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is None of these Breadth, length, height Length, breadth, height Height, breadth, length None of these Breadth, length, height Length, breadth, height Height, breadth, length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality All of these Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality All of these Cutting through walls and floors are included with the item ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 12° 14° 8° 10° 12° 14° 8° 10° ANSWER DOWNLOAD EXAMIANS APP