Estimating and Costing

Estimating and Costing
The height of the sink of wash basin above floor level is kept

75 cm to 80 cm
60 cm
70 cm
80 cm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Carpet area does not include the area of

All of these
The walls along with doors and other openings
Kitchen and pantry
Bath room and lavatory

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

3300 m³
3275 m³
3250 m³
3225 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.94 m³
1.00 m³
0.90 m³
0.98 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

3.5 m³
1.5 m³
5.0 m³
2.5 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made in square metre in case of

None of these
R.C.C. structure
Hollow concrete block wall
Cement concrete in foundation

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑