Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 75 cm to 80 cm 70 cm 60 cm 80 cm 75 cm to 80 cm 70 cm 60 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 15 cm 20 cm 10 cm None of these 15 cm 20 cm 10 cm None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Liter for capacity Cubic metre for area Meter for length Square meters for volume Liter for capacity Cubic metre for area Meter for length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Height, breadth, length None of these Breadth, length, height Length, breadth, height Height, breadth, length None of these Breadth, length, height Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of P.C. (Damp proof course) Form works Concrete Jeffries R.C. Chhajja P.C. (Damp proof course) Form works Concrete Jeffries R.C. Chhajja ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works ANSWER DOWNLOAD EXAMIANS APP