Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 70 cm 60 cm 75 cm to 80 cm 80 cm 70 cm 60 cm 75 cm to 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 1.5 m³ 5.0 m³ 3.5 m³ 2.5 m³ 1.5 m³ 5.0 m³ 3.5 m³ 2.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Room area Courtyard area W' Area Wall thickness Room area Courtyard area W' Area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: It is provided a cleaning eye at the top of the trap The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided in between the lower end of the house drain and the street sewer The water seal is less than that of ordinary traps It is provided a cleaning eye at the top of the trap The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided in between the lower end of the house drain and the street sewer The water seal is less than that of ordinary traps ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of direction All of these At every change of gradient At every 30 m intervals At every change of direction All of these At every change of gradient At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP