Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 60 cm 70 cm 75 cm to 80 cm 80 cm 60 cm 70 cm 75 cm to 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of All of these Earth work in excavation Rock cutting Excavation in trenches for foundation All of these Earth work in excavation Rock cutting Excavation in trenches for foundation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Bottom of P trap W.C. Top of P trap W.C. Main soil pipe Side of water closet Bottom of P trap W.C. Top of P trap W.C. Main soil pipe ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3225 m³ 3250 m³ 3275 m³ 3300 m³ 3225 m³ 3250 m³ 3275 m³ 3300 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Form works Concrete Jeffries R.C. Chhajja P.C. (Damp proof course) Form works Concrete Jeffries R.C. Chhajja P.C. (Damp proof course) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of R.C.C. structure Hollow concrete block wall None of these Cement concrete in foundation R.C.C. structure Hollow concrete block wall None of these Cement concrete in foundation ANSWER DOWNLOAD EXAMIANS APP