The height of the sink of wash basin above floor level is kept

80 cm
70 cm
60 cm
75 cm to 80 cm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The detention period in a septic tank is assumed

20 minutes
30 minutes
25 minutes
40 minutes

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

1500 m3
2000 m3
500 m3
1000 m3

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Anti-siphonage pipe is connected to

Bottom of P trap W.C.
Top of P trap W.C.
Main soil pipe
Side of water closet

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The concrete work for the following part of the building of specified thickness is measured in square meters

Wall panels
Root slabs
All of these
Floors

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

0.247 m³
0.274 m³
0.200 m³
0.295 m³

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑