Estimating and Costing The height of the sink of wash basin above floor level is kept 60 cm 70 cm 75 cm to 80 cm 80 cm 60 cm 70 cm 75 cm to 80 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Rock cutting Earth work in excavation Excavation in trenches for foundation All of these Rock cutting Earth work in excavation Excavation in trenches for foundation All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 7.5 sqm 10 sqm 2.5 sqm 5.0 sqm 7.5 sqm 10 sqm 2.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of works Proportion of mortar All of these Specifications of materials Specifications of works Proportion of mortar All of these Specifications of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of direction At every 30 m intervals At every change of gradient All of these At every change of direction At every 30 m intervals At every change of gradient All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of Kitchen and pantry The walls along with doors and other openings Bath room and lavatory All of these Kitchen and pantry The walls along with doors and other openings Bath room and lavatory All of these ANSWER DOWNLOAD EXAMIANS APP