Estimating and Costing The height of the sink of wash basin above floor level is kept 75 cm to 80 cm 60 cm 80 cm 70 cm 75 cm to 80 cm 60 cm 80 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Reinforced brick work Half brick wall One or more than one brick wall Brick work in arches Reinforced brick work Half brick wall One or more than one brick wall Brick work in arches ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Columns, lintels, copings (A) and (B) of the above Wall facing Building work Columns, lintels, copings (A) and (B) of the above Wall facing Building work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 14° 12° 10° 8° 14° 12° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system All of these At every 30 m intervals At every change of gradient At every change of direction All of these At every 30 m intervals At every change of gradient At every change of direction ANSWER DOWNLOAD EXAMIANS APP