Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 60 cm 75 cm to 80 cm 70 cm 80 cm 60 cm 75 cm to 80 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Liter for capacity Meter for length Cubic metre for area Square meters for volume Liter for capacity Meter for length Cubic metre for area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 15 cm 20 cm None of these 10 cm 15 cm 20 cm None of these 10 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at All of these 30 meters apart Right angle to the centre line Intermediate points having abrupt change in gradient All of these 30 meters apart Right angle to the centre line Intermediate points having abrupt change in gradient ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Concrete Jeffries Form works P.C. (Damp proof course) R.C. Chhajja Concrete Jeffries Form works P.C. (Damp proof course) R.C. Chhajja ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Quantity of the materials All of these Transportation of materials Availability of materials Quantity of the materials All of these Transportation of materials Availability of materials ANSWER DOWNLOAD EXAMIANS APP