Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building All of these The centre line is worked out separately for different sections of walls of a building The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item All of these The centre line is worked out separately for different sections of walls of a building The centre line length is reduced by half the layer of main wall joining the partition wall Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of works Specifications of materials All of these Proportion of mortar Specifications of works Specifications of materials All of these Proportion of mortar ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Quantity of the materials Availability of materials All of these Transportation of materials Quantity of the materials Availability of materials All of these Transportation of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 200 mm 175 mm 100 mm 150 mm 200 mm 175 mm 100 mm 150 mm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: Expanded metal wire netting Collapsible gates with rails Rolling shutters M.S. reinforcement of R.C.C. works Expanded metal wire netting Collapsible gates with rails Rolling shutters M.S. reinforcement of R.C.C. works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.04 sqm 0.02 sqm 0.01 sqm 0.03 sqm 0.04 sqm 0.02 sqm 0.01 sqm 0.03 sqm ANSWER DOWNLOAD EXAMIANS APP