Estimating and Costing While preparing a detailed estimate All of these Area should be measured correct to 0.01 sqm Dimension should be measured correct to 0.01 m Volume should be measured correct to 0.01 cum All of these Area should be measured correct to 0.01 sqm Dimension should be measured correct to 0.01 m Volume should be measured correct to 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 1.00 kg 0.25 kg 0.50 kg 0.75 kg 1.00 kg 0.25 kg 0.50 kg 0.75 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.01 sqm 0.04 sqm 0.03 sqm 0.02 sqm 0.01 sqm 0.04 sqm 0.03 sqm 0.02 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is None of these Height, length, breadth Length, breadth, height Breadth, length, height None of these Height, length, breadth Length, breadth, height Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Ordinary cuttings up to 1 m Both (B) and (C) Surface excavation up to 30 cm depths Surface dressing up to 15 cm depths Ordinary cuttings up to 1 m Both (B) and (C) Surface excavation up to 30 cm depths Surface dressing up to 15 cm depths ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of All of these Honey comb brick work Brick flat soling Half brick walls or the partition All of these Honey comb brick work Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP