Estimating and Costing The plinth area of a building not includes Area of the walls at the floor level Lift and wall including landing Area of cantilevered porch Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level Lift and wall including landing Area of cantilevered porch Internal shaft for sanitary installations up to 2 sq m. in area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more All of these In thin slabs, 12 mm minimum or diameter of the bar whichever is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more All of these In thin slabs, 12 mm minimum or diameter of the bar whichever is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 27,000 m³ 26,500 m³ 27,500 m³ 26,000 m³ 27,000 m³ 26,500 m³ 27,500 m³ 26,000 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 1000 m3 2000 m3 1500 m3 500 m3 1000 m3 2000 m3 1500 m3 500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Partly in excavation and partly in embankment Fully in excavation All of these Fully in embankment Partly in excavation and partly in embankment Fully in excavation All of these Fully in embankment ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Preliminary estimate Cube rate estimate Plinth area estimate Detailed estimate Preliminary estimate Cube rate estimate Plinth area estimate Detailed estimate ANSWER DOWNLOAD EXAMIANS APP