Estimating and Costing

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

8°
10°
14°
12°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made for stone work in square metre in case of

Building work
(A) and (B) of the above
Wall facing
Columns, lintels, copings

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

0.295 m³
0.200 m³
0.247 m³
0.274 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Berms are provided in canals if these are

Fully in excavation
Partly in excavation and partly in embankment
Fully in embankment
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
According to ISI method of measurement, the order of the sequence is

None of these
Breadth, length, height
Length, breadth, height
Height, length, breadth

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

8.0 sq m
6.0 sq m
2.5 sq m
4.0 sq m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑