• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Estimating and Costing

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

10°
12°
14°
8°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The damp proof course (D.P.C.) is measured in

None of these
Meters
Cub. m
Sq. m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made for stone work in square metre in case of

(A) and (B) of the above
Wall facing
Columns, lintels, copings
Building work

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

Breadth of the wall
One fourth breadth of wall on each side
Half breadth of wall on each side
None of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The concrete work for the following part of the building of specified thickness is measured in square meters

Root slabs
Floors
Wall panels
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The detention period in a septic tank is assumed

25 minutes
30 minutes
40 minutes
20 minutes

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑