The slope of the outlet of 'P trap' below the horizontal is kept

12°
10°
8°
14°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Cutting
Surface dressing
Excavation
Surface excavation

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the excavation where measurements are made in square meters for payment.

Surface excavation up to 30 cm depths
Ordinary cuttings up to 1 m
Surface dressing up to 15 cm depths
Both (B) and (C)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

At every change of gradient
At every change of direction
At every 30 m intervals
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made for stone work in square metre in case of

Wall facing
(A) and (B) of the above
Building work
Columns, lintels, copings

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Brick walls are measured in sq. m if the thickness of the wall is

20 cm
10 cm
None of these
15 cm

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑