Estimating and Costing

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

14°
8°
10°
12°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The plinth area of a building not includes

Internal shaft for sanitary installations up to 2 sq m. in area
Area of cantilevered porch
Lift and wall including landing
Area of the walls at the floor level

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The height of the sink of wash basin above floor level is kept

60 cm
70 cm
80 cm
75 cm to 80 cm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.90 m³
0.98 m³
1.00 m³
0.94 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

⅓ × (b - rd)²/(r + s)
⅓ × (b - rd)²/(r - s)
⅓ × (b - rd)²/(s - r)
½ × (b + rd)²/(r - s)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

1.75 m³
1.50 m³
1.25 m³
1.00 m³

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑