Estimating and Costing

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

14°
8°
10°
12°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Size, capacity and materials need be specified for

Bib-cocks
All of these
Stop-cocks
Ball valves

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Anti-siphonage pipe is connected to

Top of P trap W.C.
Side of water closet
Bottom of P trap W.C.
Main soil pipe

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The most reliable estimate is

Plinth area estimate
Detailed estimate
Cube rate estimate
Preliminary estimate

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

At every change of gradient
At every change of direction
At every 30 m intervals
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

2.5 sq m
6.0 sq m
4.0 sq m
8.0 sq m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑