Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 12° 10° 14° 8° 12° 10° 14° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: All listed here Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m All listed here Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Availability of materials All of these Quantity of the materials Transportation of materials Availability of materials All of these Quantity of the materials Transportation of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 0.75 kg 0.50 kg 1.00 kg 0.25 kg 0.75 kg 0.50 kg 1.00 kg 0.25 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken All of these 1.80 liters for 5 to 10 users 1.35 for 20 users 1.20 liters for 15 users All of these 1.80 liters for 5 to 10 users 1.35 for 20 users 1.20 liters for 15 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.00 m³ 1.25 m³ 1.50 m³ 1.75 m³ 1.00 m³ 1.25 m³ 1.50 m³ 1.75 m³ ANSWER DOWNLOAD EXAMIANS APP