Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 14° 12° 10° 8° 14° 12° 10° 8° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Height, breadth, length None of these Length, breadth, height Breadth, length, height Height, breadth, length None of these Length, breadth, height Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Liter for capacity Meter for length Cubic metre for area Square meters for volume Liter for capacity Meter for length Cubic metre for area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. All of these Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item All of these Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.200 m³ 0.295 m³ 0.247 m³ 0.274 m³ 0.200 m³ 0.295 m³ 0.247 m³ 0.274 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.75 m³ 1.50 m³ 1.00 m³ 1.25 m³ 1.75 m³ 1.50 m³ 1.00 m³ 1.25 m³ ANSWER DOWNLOAD EXAMIANS APP