Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 14° 8° 12° 10° 14° 8° 12° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Collapsible gates Rolling shutters All listed here Ventilators and glazing Collapsible gates Rolling shutters All listed here Ventilators and glazing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Earthwork, Concrete work, Brick work All of these Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work All of these Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are All of these Partly in excavation and partly in embankment Fully in excavation Fully in embankment All of these Partly in excavation and partly in embankment Fully in excavation Fully in embankment ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (2 × 0.4 d) L + 0.42 d L + (2 × 0.42 d) L - (0.42 d) L - (2 × 0.4 d) L + 0.42 d L + (2 × 0.42 d) L - (0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Octagonal buildings All of these Circular buildings Hexagonal buildings Octagonal buildings All of these Circular buildings Hexagonal buildings ANSWER DOWNLOAD EXAMIANS APP