Estimating and Costing

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

12°
10°
14°
8°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

L + (2 × 0.42 d)
L - (2 × 0.4 d)
L + 0.42 d
L - (0.42 d)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The trap which is provided to disconnect the house drain from the street sewer is called

All listed here
Interception manhole
Intercepting trap
Master trap

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

1.00 m³
1.50 m³
1.25 m³
1.75 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

30 D
59 D
39 D
50 D

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The order of booking dimensions is

None of these
Height, breadth, length
Length, breadth, height
Breadth, length, height

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑