Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 14° 12° 10° 8° 14° 12° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.03 cum 0.04 cum 0.02 cum 0.01 cum 0.03 cum 0.04 cum 0.02 cum 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Excavation Surface excavation Cutting Surface dressing Excavation Surface excavation Cutting Surface dressing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Length, breadth, height None of these Height, breadth, length Breadth, length, height Length, breadth, height None of these Height, breadth, length Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.20 liters for 15 users All of these 1.80 liters for 5 to 10 users 1.35 for 20 users 1.20 liters for 15 users All of these 1.80 liters for 5 to 10 users 1.35 for 20 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Prismoidal formula Trapezoidal formula All of these Mid-section formula Prismoidal formula Trapezoidal formula All of these Mid-section formula ANSWER DOWNLOAD EXAMIANS APP