Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 14° 8° 12° 10° 14° 8° 12° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Collapsible gates Rolling shutters Ventilators and glazing All listed here Collapsible gates Rolling shutters Ventilators and glazing All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 4.0 sq m 8.0 sq m 6.0 sq m 2.5 sq m 4.0 sq m 8.0 sq m 6.0 sq m 2.5 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 1.00 cum 2.00 cum 4.00 cum 3.00 cum 1.00 cum 2.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is √[d² × (ds)²] L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Octagonal buildings All of these Hexagonal buildings Circular buildings Octagonal buildings All of these Hexagonal buildings Circular buildings ANSWER DOWNLOAD EXAMIANS APP