Estimating and Costing

Estimating and Costing
The measurement is not made in square meters in case of

Form works
P.C. (Damp proof course)
R.C. Chhajja
Concrete Jeffries

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The detention period in a septic tank is assumed

20 minutes
40 minutes
25 minutes
30 minutes

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

3225 m³
3250 m³
3275 m³
3300 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

59 D
30 D
39 D
50 D

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The 'centre line method' is specially adopted for estimating

Hexagonal buildings
All of these
Octagonal buildings
Circular buildings

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of payment is made for 100 cu m (per % cu m) in case of

Excavation in trenches for foundation
All of these
Rock cutting
Earth work in excavation

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑