Estimating and Costing The measurement is not made in square meters in case of Concrete Jeffries R.C. Chhajja Form works P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja Form works P.C. (Damp proof course) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on All of these Proportion of mortar Specifications of materials Specifications of works All of these Proportion of mortar Specifications of materials Specifications of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of Honey comb brick work Half brick walls or the partition All of these Brick flat soling Honey comb brick work Half brick walls or the partition All of these Brick flat soling ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 12° 14° 8° 10° 12° 14° 8° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is None of these Breadth, length, height Length, breadth, height Height, breadth, length None of these Breadth, length, height Length, breadth, height Height, breadth, length ANSWER DOWNLOAD EXAMIANS APP