Estimating and Costing The measurement is not made in square meters in case of Form works P.C. (Damp proof course) R.C. Chhajja Concrete Jeffries Form works P.C. (Damp proof course) R.C. Chhajja Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (0.42 d) L + 0.42 d L + (2 × 0.42 d) L - (2 × 0.4 d) L - (0.42 d) L + 0.42 d L + (2 × 0.42 d) L - (2 × 0.4 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 1.5 m³ 2.5 m³ 3.5 m³ 5.0 m³ 1.5 m³ 2.5 m³ 3.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate All of these Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm All of these Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Pipes laid in trenches and pipes fixed to walls are measured separately All of these Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately All of these Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Earth work in excavation All of these Rock cutting Excavation in trenches for foundation Earth work in excavation All of these Rock cutting Excavation in trenches for foundation ANSWER DOWNLOAD EXAMIANS APP