Estimating and Costing

Estimating and Costing
The item of steel work which is measured in sq.m, is

Collapsible gates
Rolling shutters
Ventilators and glazing
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Berms are provided in canals if these are

All of these
Fully in embankment
Fully in excavation
Partly in excavation and partly in embankment

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

0.200 m³
0.247 m³
0.295 m³
0.274 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The order of booking dimensions is

Breadth, length, height
Length, breadth, height
Height, breadth, length
None of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The unit of measurement is per quintal for the following:

Expanded metal wire netting
M.S. reinforcement of R.C.C. works
Rolling shutters
Collapsible gates with rails

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

One fourth breadth of wall on each side
Breadth of the wall
Half breadth of wall on each side
None of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑