Estimating and Costing The item of steel work which is measured in sq.m, is Ventilators and glazing Rolling shutters Collapsible gates All listed here Ventilators and glazing Rolling shutters Collapsible gates All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for All of these Stop-cocks Bib-cocks Ball valves All of these Stop-cocks Bib-cocks Ball valves ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 30 D 59 D 39 D 50 D 30 D 59 D 39 D 50 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Surface dressing Excavation Surface excavation Cutting Surface dressing Excavation Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Bed concreting Connection to drains All of these Setting and laying Bed concreting Connection to drains All of these Setting and laying ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries Form works R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries Form works ANSWER DOWNLOAD EXAMIANS APP