Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (2 × 0.4 d) L - (0.42 d) L + 0.42 d L + (2 × 0.42 d) L - (2 × 0.4 d) L - (0.42 d) L + 0.42 d L + (2 × 0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Master trap Interception manhole All listed here Intercepting trap Master trap Interception manhole All listed here Intercepting trap ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Rock cutting All of these Excavation in trenches for foundation Earth work in excavation Rock cutting All of these Excavation in trenches for foundation Earth work in excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Lavatory basins Water closets Flushing pipes All listed here Lavatory basins Water closets Flushing pipes All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula All of these Prismoidal formula Trapezoidal formula Mid-section formula All of these Prismoidal formula Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Brick edging Reinforced brick work Brick work in arches Broken glass coping Brick edging Reinforced brick work Brick work in arches Broken glass coping ANSWER DOWNLOAD EXAMIANS APP