Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (2 × 0.4 d) L + (2 × 0.42 d) L + 0.42 d L - (0.42 d) L - (2 × 0.4 d) L + (2 × 0.42 d) L + 0.42 d L - (0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Preliminary estimate Cube rate estimate Detailed estimate Plinth area estimate Preliminary estimate Cube rate estimate Detailed estimate Plinth area estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Room area Wall thickness W' Area Courtyard area Room area Wall thickness W' Area Courtyard area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Bed concreting Setting and laying All of these Connection to drains Bed concreting Setting and laying All of these Connection to drains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 4.00 cum 2.00 cum 1.00 cum 3.00 cum 4.00 cum 2.00 cum 1.00 cum 3.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Bottom of P trap W.C. Top of P trap W.C. Main soil pipe Side of water closet Bottom of P trap W.C. Top of P trap W.C. Main soil pipe Side of water closet ANSWER DOWNLOAD EXAMIANS APP