Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on All of these Specifications of works Proportion of mortar Specifications of materials All of these Specifications of works Proportion of mortar Specifications of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.04 0.05 0.025 0.02 0.04 0.05 0.025 0.02 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.75 m³ 1.00 m³ 1.25 m³ 1.50 m³ 1.75 m³ 1.00 m³ 1.25 m³ 1.50 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Interception manhole Master trap All listed here Intercepting trap Interception manhole Master trap All listed here Intercepting trap ANSWER DOWNLOAD EXAMIANS APP