Estimating and Costing Size, capacity and materials need be specified for Bib-cocks Ball valves Stop-cocks All of these Bib-cocks Ball valves Stop-cocks All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Site clearance Setting out of works All listed here Steps in deep excavation Site clearance Setting out of works All listed here Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: Rolling shutters M.S. reinforcement of R.C.C. works Collapsible gates with rails Expanded metal wire netting Rolling shutters M.S. reinforcement of R.C.C. works Collapsible gates with rails Expanded metal wire netting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of All of these Honey comb brick work Half brick walls or the partition Brick flat soling All of these Honey comb brick work Half brick walls or the partition Brick flat soling ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.03 sqm 0.01 sqm 0.04 sqm 0.02 sqm 0.03 sqm 0.01 sqm 0.04 sqm 0.02 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Detailed estimate Preliminary estimate Plinth area estimate Cube rate estimate Detailed estimate Preliminary estimate Plinth area estimate Cube rate estimate ANSWER DOWNLOAD EXAMIANS APP