Estimating and Costing

Estimating and Costing
Size, capacity and materials need be specified for

Stop-cocks
Bib-cocks
Ball valves
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of steel work which is measured in sq.m, is

Collapsible gates
Rolling shutters
All listed here
Ventilators and glazing

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Berms are provided in canals if these are

Fully in excavation
All of these
Partly in excavation and partly in embankment
Fully in embankment

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

Bd + Sd2
B + d + Sd
B × d - Sd1/2
½ (Bd + Sd2)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

4.0 sq m
2.5 sq m
6.0 sq m
8.0 sq m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The trap which is provided to disconnect the house drain from the street sewer is called

Intercepting trap
Interception manhole
All listed here
Master trap

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑