• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Estimating and Costing

Estimating and Costing
Size, capacity and materials need be specified for

All of these
Ball valves
Stop-cocks
Bib-cocks

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The most reliable estimate is

Detailed estimate
Plinth area estimate
Preliminary estimate
Cube rate estimate

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The damp proof course (D.P.C.) is measured in

Meters
None of these
Sq. m
Cub. m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The brick work is measured in sq metre, in case of

Honey comb brick work
All of these
Half brick walls or the partition
Brick flat soling

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is

L.D √(1 + s²)
d × d × s
√[d² × (ds)²]
2 L.D √(1 + s²)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

0.05
0.04
0.025
0.02

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑