Estimating and Costing Size, capacity and materials need be specified for Stop-cocks Bib-cocks All of these Ball valves Stop-cocks Bib-cocks All of these Ball valves ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Excavation in trenches for foundation Rock cutting Earth work in excavation All of these Excavation in trenches for foundation Rock cutting Earth work in excavation All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.03 cum 0.02 cum 0.01 cum 0.04 cum 0.03 cum 0.02 cum 0.01 cum 0.04 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: It is provided in between the lower end of the house drain and the street sewer It is provided a cleaning eye at the top of the trap The water seal is less than that of ordinary traps The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided in between the lower end of the house drain and the street sewer It is provided a cleaning eye at the top of the trap The water seal is less than that of ordinary traps The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.75 m³ 1.50 m³ 1.25 m³ 1.00 m³ 1.75 m³ 1.50 m³ 1.25 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Columns, lintels, copings Building work (A) and (B) of the above Wall facing Columns, lintels, copings Building work (A) and (B) of the above Wall facing ANSWER DOWNLOAD EXAMIANS APP