Estimating and Costing Size, capacity and materials need be specified for All of these Bib-cocks Stop-cocks Ball valves All of these Bib-cocks Stop-cocks Ball valves ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Height, length, breadth None of these Length, breadth, height Breadth, length, height Height, length, breadth None of these Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters All of these Wall panels Root slabs Floors All of these Wall panels Root slabs Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of gradient All of these At every change of direction At every 30 m intervals At every change of gradient All of these At every change of direction At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.04 sqm 0.01 sqm 0.02 sqm 0.03 sqm 0.04 sqm 0.01 sqm 0.02 sqm 0.03 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 19 cm x 9 cm x 9 cm 23 cm x 11.5 cm x 7.5 cm 25 cm x 13 cm x 7.5 cm 20 cm x 10 cm x 10 cm 19 cm x 9 cm x 9 cm 23 cm x 11.5 cm x 7.5 cm 25 cm x 13 cm x 7.5 cm 20 cm x 10 cm x 10 cm ANSWER DOWNLOAD EXAMIANS APP