Estimating and Costing

Estimating and Costing
Size, capacity and materials need be specified for

All of these
Stop-cocks
Ball valves
Bib-cocks

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

Bolts
Cleats
Brackets
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn for earth work in excavation in ordinary soil per workman per day is

1.00 cum
2.00 cum
3.00 cum
4.00 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Anti-siphonage pipe is connected to

Main soil pipe
Top of P trap W.C.
Bottom of P trap W.C.
Side of water closet

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The volume is measured correct to the nearest

0.04 cum
0.02 cum
0.03 cum
0.01 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Surface dressing
Surface excavation
Cutting
Excavation

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑