Estimating and Costing

Estimating and Costing
Size, capacity and materials need be specified for

All of these
Ball valves
Bib-cocks
Stop-cocks

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The brick work is measured in sq metre, in case of

Honey comb brick work
Half brick walls or the partition
Brick flat soling
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The volume is measured correct to the nearest

0.03 cum
0.04 cum
0.02 cum
0.01 cum

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

3.5 m³
2.5 m³
5.0 m³
1.5 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

L + (2 × 0.42 d)
L + 0.42 d
L - (0.42 d)
L - (2 × 0.4 d)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

2000 m3
1000 m3
1500 m3
500 m3

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑