Estimating and Costing Size, capacity and materials need be specified for Ball valves Bib-cocks Stop-cocks All of these Ball valves Bib-cocks Stop-cocks All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work All of these Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work All of these Brickwork Flooring, Wood work, Steel work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: The total length of centre line of four walls is 20 m All listed here Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m All listed here Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 75 cm 90 cm 70 cm 80 cm 75 cm 90 cm 70 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building All of these Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line length is reduced by half the layer of main wall joining the partition wall The centre line is worked out separately for different sections of walls of a building All of these Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line length is reduced by half the layer of main wall joining the partition wall The centre line is worked out separately for different sections of walls of a building ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 Bd + Sd2 ½ (Bd + Sd2) B + d + Sd B × d - Sd1/2 Bd + Sd2 ½ (Bd + Sd2) B + d + Sd ANSWER DOWNLOAD EXAMIANS APP