Estimating and Costing Size, capacity and materials need be specified for Stop-cocks Bib-cocks All of these Ball valves Stop-cocks Bib-cocks All of these Ball valves ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Site clearance All listed here Steps in deep excavation Setting out of works Site clearance All listed here Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Both (B) and (C) Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Both (B) and (C) Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 60 cm 70 cm 75 cm to 80 cm 80 cm 60 cm 70 cm 75 cm to 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and One fourth breadth of wall on each side None of these Breadth of the wall Half breadth of wall on each side One fourth breadth of wall on each side None of these Breadth of the wall Half breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP