Estimating and Costing Size, capacity and materials need be specified for All of these Bib-cocks Ball valves Stop-cocks All of these Bib-cocks Ball valves Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 2.00 cum 1.00 cum 4.00 cum 3.00 cum 2.00 cum 1.00 cum 4.00 cum 3.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is All listed here Ventilators and glazing Rolling shutters Collapsible gates All listed here Ventilators and glazing Rolling shutters Collapsible gates ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Excavation Surface excavation Surface dressing Cutting Excavation Surface excavation Surface dressing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of The walls along with doors and other openings Bath room and lavatory Kitchen and pantry All of these The walls along with doors and other openings Bath room and lavatory Kitchen and pantry All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The correct Prismoidal formula for volume is D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] D/6 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas] D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] D/6 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas] D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] ANSWER DOWNLOAD EXAMIANS APP