Size, capacity and materials need be specified for

Bib-cocks
Stop-cocks
All of these
Ball valves

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

Setting out of works
Steps in deep excavation
Site clearance
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

3275 m³
3250 m³
3225 m³
3300 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of half brick partition wall per mason per day is

1.5 m2
2.0 m2
5.0 m2
4.0 m2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

Bolts
Cleats
All listed here
Brackets

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The volume is measured correct to the nearest

0.02 cum
0.04 cum
0.01 cum
0.03 cum

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑