Estimating and Costing Size, capacity and materials need be specified for Ball valves All of these Bib-cocks Stop-cocks Ball valves All of these Bib-cocks Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Excavation in trenches for foundation Rock cutting All of these Earth work in excavation Excavation in trenches for foundation Rock cutting All of these Earth work in excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 100 mm 150 mm 175 mm 200 mm 100 mm 150 mm 175 mm 200 mm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 1.00 cum 2.00 cum 4.00 cum 3.00 cum 1.00 cum 2.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Room area Courtyard area Wall thickness W' Area Room area Courtyard area Wall thickness ANSWER DOWNLOAD EXAMIANS APP