Estimating and Costing Size, capacity and materials need be specified for All of these Stop-cocks Ball valves Bib-cocks All of these Stop-cocks Ball valves Bib-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Bolts Cleats Brackets All listed here Bolts Cleats Brackets All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 1.00 cum 2.00 cum 3.00 cum 4.00 cum 1.00 cum 2.00 cum 3.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Main soil pipe Top of P trap W.C. Bottom of P trap W.C. Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.04 cum 0.02 cum 0.03 cum 0.01 cum 0.04 cum 0.02 cum 0.03 cum 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface dressing Surface excavation Cutting Excavation Surface dressing Surface excavation Cutting Excavation ANSWER DOWNLOAD EXAMIANS APP