Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.025 0.04 0.02 0.05 0.025 0.04 0.02 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are All of these Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work All of these Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Partly in excavation and partly in embankment Fully in embankment Fully in excavation All of these Partly in excavation and partly in embankment Fully in embankment Fully in excavation All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 39 D 50 D 59 D 30 D 39 D 50 D 59 D 30 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied All listed here The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Excavation Surface excavation Surface dressing Cutting Excavation Surface excavation Surface dressing ANSWER DOWNLOAD EXAMIANS APP