Estimating and Costing Carpet area does not include the area of The walls along with doors and other openings All of these Kitchen and pantry Bath room and lavatory The walls along with doors and other openings All of these Kitchen and pantry Bath room and lavatory ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.25 m³ 1.50 m³ 1.75 m³ 1.00 m³ 1.25 m³ 1.50 m³ 1.75 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by All of these Trapezoidal formula Prismoidal formula Mid-section formula All of these Trapezoidal formula Prismoidal formula Mid-section formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 2.00 cum 1.00 cum 3.00 cum 4.00 cum 2.00 cum 1.00 cum 3.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.025 0.02 0.04 0.05 0.025 0.02 0.04 0.05 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters All of these Root slabs Floors Wall panels All of these Root slabs Floors Wall panels ANSWER DOWNLOAD EXAMIANS APP