Estimating and Costing Carpet area does not include the area of Bath room and lavatory Kitchen and pantry All of these The walls along with doors and other openings Bath room and lavatory Kitchen and pantry All of these The walls along with doors and other openings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 3.5 m³ 2.5 m³ 1.5 m³ 5.0 m³ 3.5 m³ 2.5 m³ 1.5 m³ 5.0 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Lavatory basins All listed here Water closets Flushing pipes Lavatory basins All listed here Water closets Flushing pipes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is All listed here Rolling shutters Collapsible gates Ventilators and glazing All listed here Rolling shutters Collapsible gates Ventilators and glazing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is L.D √(1 + s²) √[d² × (ds)²] d × d × s 2 L.D √(1 + s²) L.D √(1 + s²) √[d² × (ds)²] d × d × s 2 L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Quantity of the materials Transportation of materials All of these Availability of materials Quantity of the materials Transportation of materials All of these Availability of materials ANSWER DOWNLOAD EXAMIANS APP