Estimating and Costing The most reliable estimate is Preliminary estimate Detailed estimate Plinth area estimate Cube rate estimate Preliminary estimate Detailed estimate Plinth area estimate Cube rate estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3225 m³ 3275 m³ 3300 m³ 3250 m³ 3225 m³ 3275 m³ 3300 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.20 liters for 15 users 1.35 for 20 users All of these 1.80 liters for 5 to 10 users 1.20 liters for 15 users 1.35 for 20 users All of these 1.80 liters for 5 to 10 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.5 1 0.25 0.75 0.5 1 0.25 0.75 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Lavatory basins Flushing pipes All listed here Water closets Lavatory basins Flushing pipes All listed here Water closets ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is All of these Quantity of the materials Availability of materials Transportation of materials All of these Quantity of the materials Availability of materials Transportation of materials ANSWER DOWNLOAD EXAMIANS APP