Estimating and Costing

Estimating and Costing
The most reliable estimate is

Cube rate estimate
Detailed estimate
Plinth area estimate
Preliminary estimate

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The cross-sections for a highway is taken at

Right angle to the centre line
30 meters apart
Intermediate points having abrupt change in gradient
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

0.90 m³
1.00 m³
0.94 m³
0.98 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

1500 m3
2000 m3
500 m3
1000 m3

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area is measured correct to the nearest

0.01 sqm
0.04 sqm
0.02 sqm
0.03 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

3275 m³
3250 m³
3225 m³
3300 m³

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑