Estimating and Costing

Estimating and Costing
The most reliable estimate is

Plinth area estimate
Preliminary estimate
Detailed estimate
Cube rate estimate

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

2.5 m³
1.5 m³
3.5 m³
5.0 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

L - (2 × 0.4 d)
L - (0.42 d)
L + (2 × 0.42 d)
L + 0.42 d

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 2.5 cm cement concrete floor per mansion per day

10 sqm
2.5 sqm
7.5 sqm
5.0 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For the construction of buildings, the subheads of the estimate are

Earthwork, Concrete work, Brick work
Brickwork Flooring, Wood work, Steel work
Brickwork, Stone work, Roofing
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

1000 m3
500 m3
2000 m3
1500 m3

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑