Estimating and Costing

Estimating and Costing
The most reliable estimate is

Cube rate estimate
Preliminary estimate
Detailed estimate
Plinth area estimate

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

0.02
0.05
0.04
0.025

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The brick work is not measured in cu m in case of

Half brick wall
One or more than one brick wall
Reinforced brick work
Brick work in arches

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

2.5 m³
5.0 m³
3.5 m³
1.5 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is not made in square meters in case of

Form works
Concrete Jeffries
R.C. Chhajja
P.C. (Damp proof course)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

4.0 sq m
2.5 sq m
6.0 sq m
8.0 sq m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑