Estimating and Costing The most reliable estimate is Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Setting and laying All of these Bed concreting Connection to drains Setting and laying All of these Bed concreting Connection to drains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.025 0.02 0.04 0.05 0.025 0.02 0.04 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are All of these Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work All of these Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building All of these Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line length is reduced by half the layer of main wall joining the partition wall The centre line is worked out separately for different sections of walls of a building All of these Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item The centre line length is reduced by half the layer of main wall joining the partition wall The centre line is worked out separately for different sections of walls of a building ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for All of these Stop-cocks Ball valves Bib-cocks All of these Stop-cocks Ball valves Bib-cocks ANSWER DOWNLOAD EXAMIANS APP