Estimating and Costing The most reliable estimate is Detailed estimate Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate Preliminary estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja Form works P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja Form works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of R.C.C. structure Cement concrete in foundation Hollow concrete block wall None of these R.C.C. structure Cement concrete in foundation Hollow concrete block wall None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at Right angle to the centre line Intermediate points having abrupt change in gradient All of these 30 meters apart Right angle to the centre line Intermediate points having abrupt change in gradient All of these 30 meters apart ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Site clearance All listed here Steps in deep excavation Setting out of works Site clearance All listed here Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: Rolling shutters Expanded metal wire netting Collapsible gates with rails M.S. reinforcement of R.C.C. works Rolling shutters Expanded metal wire netting Collapsible gates with rails M.S. reinforcement of R.C.C. works ANSWER DOWNLOAD EXAMIANS APP