• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Estimating and Costing

Estimating and Costing
The most reliable estimate is

Detailed estimate
Plinth area estimate
Preliminary estimate
Cube rate estimate

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

⅓ × (b - rd)²/(r - s)
⅓ × (b - rd)²/(r + s)
⅓ × (b - rd)²/(s - r)
½ × (b + rd)²/(r - s)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
According to ISI method of measurement, the order of the sequence is

Length, breadth, height
None of these
Height, length, breadth
Breadth, length, height

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 2.5 cm cement concrete floor per mansion per day

5.0 sqm
7.5 sqm
10 sqm
2.5 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For the construction of buildings, the subheads of the estimate are

Brickwork, Stone work, Roofing
Brickwork Flooring, Wood work, Steel work
Earthwork, Concrete work, Brick work
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of the brick structure measured in sq.m, is

Brick edging
Brick work in arches
Broken glass coping
Reinforced brick work

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑