Estimating and Costing The most reliable estimate is Plinth area estimate Cube rate estimate Detailed estimate Preliminary estimate Plinth area estimate Cube rate estimate Detailed estimate Preliminary estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called All listed here Intercepting trap Master trap Interception manhole All listed here Intercepting trap Master trap Interception manhole ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Liter for capacity Square meters for volume Meter for length Cubic metre for area Liter for capacity Square meters for volume Meter for length Cubic metre for area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 2.00 cum 3.00 cum 4.00 cum 1.00 cum 2.00 cum 3.00 cum 4.00 cum 1.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is d × d × s L.D √(1 + s²) 2 L.D √(1 + s²) √[d² × (ds)²] d × d × s L.D √(1 + s²) 2 L.D √(1 + s²) √[d² × (ds)²] ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is None of these Height, breadth, length Breadth, length, height Length, breadth, height None of these Height, breadth, length Breadth, length, height Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP