Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Bed concreting Connection to drains All of these Setting and laying Bed concreting Connection to drains All of these Setting and laying ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm All of these Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm All of these Volume should be measured correct to 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Building work Columns, lintels, copings Wall facing (A) and (B) of the above Building work Columns, lintels, copings Wall facing (A) and (B) of the above ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Breadth, length, height None of these Length, breadth, height Height, breadth, length Breadth, length, height None of these Length, breadth, height Height, breadth, length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface dressing Excavation Cutting Surface excavation Surface dressing Excavation Cutting Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r + s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r + s) ½ × (b + rd)²/(r - s) ANSWER DOWNLOAD EXAMIANS APP