Estimating and Costing

Estimating and Costing
In case of laying gullies, siphons, intercepting traps, the cost includes

Setting and laying
Bed concreting
All of these
Connection to drains

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The main factor to be considered while preparing a detailed estimate, is

Quantity of the materials
Availability of materials
All of these
Transportation of materials

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of 2.5 cm cement concrete floor per mansion per day

2.5 sqm
7.5 sqm
5.0 sqm
10 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is

2 L.D √(1 + s²)
L.D √(1 + s²)
√[d² × (ds)²]
d × d × s

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

1.00 m³
1.50 m³
1.25 m³
1.75 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
According to Indian Standards Institute, the actual size of modular bricks is

23 cm x 11.5 cm x 7.5 cm
20 cm x 10 cm x 10 cm
25 cm x 13 cm x 7.5 cm
19 cm x 9 cm x 9 cm

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑