Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Connection to drains All of these Setting and laying Bed concreting Connection to drains All of these Setting and laying Bed concreting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m All listed here Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m All listed here Length of long wall out-to-out is 6.80 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 2.5 sq m 6.0 sq m 4.0 sq m 8.0 sq m 2.5 sq m 6.0 sq m 4.0 sq m 8.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.25 1 0.75 0.5 0.25 1 0.75 0.5 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate All of these Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m All of these Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Cubic metre for area Meter for length Liter for capacity Square meters for volume Cubic metre for area Meter for length Liter for capacity Square meters for volume ANSWER DOWNLOAD EXAMIANS APP