Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Connection to drains Bed concreting Setting and laying All of these Connection to drains Bed concreting Setting and laying All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Wall thickness Room area Courtyard area W' Area Wall thickness Room area Courtyard area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Octagonal buildings Circular buildings All of these Hexagonal buildings Octagonal buildings Circular buildings All of these Hexagonal buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is (6 + 12) chains (6 + 18) chains None of these (6 + 15) chains (6 + 12) chains (6 + 18) chains None of these (6 + 15) chains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of All of these Half brick walls or the partition Brick flat soling Honey comb brick work All of these Half brick walls or the partition Brick flat soling Honey comb brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes ANSWER DOWNLOAD EXAMIANS APP