Estimating and Costing

Estimating and Costing
In case of laying gullies, siphons, intercepting traps, the cost includes

All of these
Setting and laying
Connection to drains
Bed concreting

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area is measured correct to the nearest

0.04 sqm
0.03 sqm
0.02 sqm
0.01 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of half brick partition wall per mason per day is

1.5 m2
4.0 m2
2.0 m2
5.0 m2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Room area
Wall thickness
W' Area
Courtyard area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The item of the brick structure measured in sq.m, is

Reinforced brick work
Brick edging
Brick work in arches
Broken glass coping

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the excavation where measurements are made in square meters for payment.

Surface excavation up to 30 cm depths
Both (B) and (C)
Surface dressing up to 15 cm depths
Ordinary cuttings up to 1 m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑