Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Setting and laying Bed concreting All of these Connection to drains Setting and laying Bed concreting All of these Connection to drains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Quantity of the materials Availability of materials All of these Transportation of materials Quantity of the materials Availability of materials All of these Transportation of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 2.5 sqm 7.5 sqm 5.0 sqm 10 sqm 2.5 sqm 7.5 sqm 5.0 sqm 10 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) L.D √(1 + s²) √[d² × (ds)²] d × d × s 2 L.D √(1 + s²) L.D √(1 + s²) √[d² × (ds)²] d × d × s ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.00 m³ 1.50 m³ 1.25 m³ 1.75 m³ 1.00 m³ 1.50 m³ 1.25 m³ 1.75 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm ANSWER DOWNLOAD EXAMIANS APP