Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Connection to drains Setting and laying Bed concreting All of these Connection to drains Setting and laying Bed concreting All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height None of these Height, length, breadth Length, breadth, height Breadth, length, height None of these Height, length, breadth Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.01 cum 0.04 cum 0.02 cum 0.03 cum 0.01 cum 0.04 cum 0.02 cum 0.03 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.04 0.02 0.025 0.05 0.04 0.02 0.025 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 59 D 30 D 50 D 39 D 59 D 30 D 50 D 39 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 150 mm 200 mm 175 mm 100 mm 150 mm 200 mm 175 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP