Estimating and Costing

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

2.5 sq m
6.0 sq m
4.0 sq m
8.0 sq m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The measurement is made in square metre in case of

Cement concrete in foundation
None of these
Hollow concrete block wall
R.C.C. structure

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In case of laying gullies, siphons, intercepting traps, the cost includes

All of these
Connection to drains
Bed concreting
Setting and laying

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

All of these
Mid-section formula
Prismoidal formula
Trapezoidal formula

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

10°
12°
8°
14°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.

27,500 m³
26,000 m³
26,500 m³
27,000 m³

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑