• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Estimating and Costing

Estimating and Costing
The expected out turn of 12 mm plastering with cement mortar is

8.0 sq m
2.5 sq m
6.0 sq m
4.0 sq m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The detention period in a septic tank is assumed

20 minutes
40 minutes
30 minutes
25 minutes

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

W' Area
Wall thickness
Room area
Courtyard area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area is measured correct to the nearest

0.02 sqm
0.04 sqm
0.01 sqm
0.03 sqm

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the excavation where measurements are made in square meters for payment.

Surface excavation up to 30 cm depths
Surface dressing up to 15 cm depths
Ordinary cuttings up to 1 m
Both (B) and (C)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of an item of work depends on

Specifications of works
All of these
Specifications of materials
Proportion of mortar

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑