Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 8.0 sq m 6.0 sq m 4.0 sq m 2.5 sq m 8.0 sq m 6.0 sq m 4.0 sq m 2.5 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 59 D 50 D 39 D 30 D 59 D 50 D 39 D 30 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 75 cm 90 cm 70 cm 80 cm 75 cm 90 cm 70 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The end sections are parallel planes The mid-area of a pyramid is half the average area of the ends All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The end sections are parallel planes The mid-area of a pyramid is half the average area of the ends All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 1.5 m³ 5.0 m³ 3.5 m³ 2.5 m³ 1.5 m³ 5.0 m³ 3.5 m³ 2.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Bed concreting Setting and laying All of these Connection to drains Bed concreting Setting and laying All of these Connection to drains ANSWER DOWNLOAD EXAMIANS APP