Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 2.5 sq m 8.0 sq m 4.0 sq m 6.0 sq m 2.5 sq m 8.0 sq m 4.0 sq m 6.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 1.00 cum 3.00 cum 4.00 cum 2.00 cum 1.00 cum 3.00 cum 4.00 cum 2.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + (2 × 0.42 d) L - (0.42 d) L - (2 × 0.4 d) L + 0.42 d L + (2 × 0.42 d) L - (0.42 d) L - (2 × 0.4 d) L + 0.42 d ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 15 cm None of these 10 cm 20 cm 15 cm None of these 10 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in excavation Fully in embankment Partly in excavation and partly in embankment All of these Fully in excavation Fully in embankment Partly in excavation and partly in embankment All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is d × d × s L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) d × d × s L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP