The expected out turn of 12 mm plastering with cement mortar is

8.0 sq m
2.5 sq m
4.0 sq m
6.0 sq m

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Size, capacity and materials need be specified for

All of these
Stop-cocks
Ball valves
Bib-cocks

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of payment is made for 100 cu m (per % cu m) in case of

Excavation in trenches for foundation
Rock cutting
Earth work in excavation
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

None of these
(6 + 15) chains
(6 + 12) chains
(6 + 18) chains

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is

d × d × s
√[d² × (ds)²]
L.D √(1 + s²)
2 L.D √(1 + s²)

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The 'centre line method' is specially adopted for estimating

Circular buildings
Octagonal buildings
All of these
Hexagonal buildings

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑