Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 6.0 sq m 2.5 sq m 8.0 sq m 4.0 sq m 6.0 sq m 2.5 sq m 8.0 sq m 4.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at All of these Right angle to the centre line 30 meters apart Intermediate points having abrupt change in gradient All of these Right angle to the centre line 30 meters apart Intermediate points having abrupt change in gradient ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.02 cum 0.03 cum 0.04 cum 0.01 cum 0.02 cum 0.03 cum 0.04 cum 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 20 minutes 30 minutes 25 minutes 40 minutes 20 minutes 30 minutes 25 minutes 40 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m All listed here The total length of centre line of four walls is 20 m Length of long wall out-to-out is 6.80 m Length of short walls in-to-in is 3.20 m All listed here The total length of centre line of four walls is 20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these In thin slabs, 12 mm minimum or diameter of the bar whichever is more For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these In thin slabs, 12 mm minimum or diameter of the bar whichever is more ANSWER DOWNLOAD EXAMIANS APP