Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 8.0 sq m 4.0 sq m 2.5 sq m 6.0 sq m 8.0 sq m 4.0 sq m 2.5 sq m 6.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 2.5 m³ 1.5 m³ 3.5 m³ 5.0 m³ 2.5 m³ 1.5 m³ 3.5 m³ 5.0 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 50 D 39 D 30 D 59 D 50 D 39 D 30 D 59 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and One fourth breadth of wall on each side Breadth of the wall None of these Half breadth of wall on each side One fourth breadth of wall on each side Breadth of the wall None of these Half breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The end sections are parallel planes The mid-area of a pyramid is half the average area of the ends All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The end sections are parallel planes The mid-area of a pyramid is half the average area of the ends All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd B × d - Sd1/2 ½ (Bd + Sd2) Bd + Sd2 B + d + Sd B × d - Sd1/2 ½ (Bd + Sd2) Bd + Sd2 ANSWER DOWNLOAD EXAMIANS APP