Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 6.0 sq m 4.0 sq m 2.5 sq m 8.0 sq m 6.0 sq m 4.0 sq m 2.5 sq m 8.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Brick work in arches Broken glass coping Reinforced brick work Brick edging Brick work in arches Broken glass coping Reinforced brick work Brick edging ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.025 0.02 0.04 0.05 0.025 0.02 0.04 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 100 mm 175 mm 200 mm 150 mm 100 mm 175 mm 200 mm 150 mm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth All of these The mean depth is the average of depths of two consecutive sections The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The area of mid-sections is calculated by using mean depth All of these The mean depth is the average of depths of two consecutive sections The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken All of these 1.35 for 20 users 1.20 liters for 15 users 1.80 liters for 5 to 10 users All of these 1.35 for 20 users 1.20 liters for 15 users 1.80 liters for 5 to 10 users ANSWER DOWNLOAD EXAMIANS APP