Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 6.0 sq m 4.0 sq m 8.0 sq m 2.5 sq m 6.0 sq m 4.0 sq m 8.0 sq m 2.5 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Excavation in trenches for foundation Rock cutting Earth work in excavation All of these Excavation in trenches for foundation Rock cutting Earth work in excavation All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in Cub. m Meters Sq. m None of these Cub. m Meters Sq. m None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 60 cm 70 cm 75 cm to 80 cm 80 cm 60 cm 70 cm 75 cm to 80 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate All of these Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m All of these Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP