Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s 2 L.D √(1 + s²) √[d² × (ds)²] L.D √(1 + s²) d × d × s ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 75 cm 90 cm 70 cm 80 cm 75 cm 90 cm 70 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Liter for capacity Square meters for volume Cubic metre for area Meter for length Liter for capacity Square meters for volume Cubic metre for area Meter for length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 2.00 cum 1.00 cum 4.00 cum 3.00 cum 2.00 cum 1.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of The walls along with doors and other openings Bath room and lavatory Kitchen and pantry All of these The walls along with doors and other openings Bath room and lavatory Kitchen and pantry All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.04 0.02 0.05 0.025 0.04 0.02 0.05 0.025 ANSWER DOWNLOAD EXAMIANS APP