Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) L.D √(1 + s²) √[d² × (ds)²] d × d × s 2 L.D √(1 + s²) L.D √(1 + s²) √[d² × (ds)²] d × d × s ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of Half brick walls or the partition Brick flat soling Honey comb brick work All of these Half brick walls or the partition Brick flat soling Honey comb brick work All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.200 m³ 0.295 m³ 0.274 m³ 0.247 m³ 0.200 m³ 0.295 m³ 0.274 m³ 0.247 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Rock cutting Excavation in trenches for foundation All of these Earth work in excavation Rock cutting Excavation in trenches for foundation All of these Earth work in excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Intercepting trap Master trap All listed here Interception manhole Intercepting trap Master trap All listed here Interception manhole ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 2000 m3 1000 m3 1500 m3 500 m3 2000 m3 1000 m3 1500 m3 500 m3 ANSWER DOWNLOAD EXAMIANS APP