Estimating and Costing The brick work is measured in sq metre, in case of Brick flat soling Honey comb brick work Half brick walls or the partition All of these Brick flat soling Honey comb brick work Half brick walls or the partition All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Height, length, breadth None of these Length, breadth, height Breadth, length, height Height, length, breadth None of these Length, breadth, height Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is L.D √(1 + s²) 2 L.D √(1 + s²) d × d × s √[d² × (ds)²] L.D √(1 + s²) 2 L.D √(1 + s²) d × d × s √[d² × (ds)²] ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 20 minutes 30 minutes 25 minutes 40 minutes 20 minutes 30 minutes 25 minutes 40 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.50 m³ 1.75 m³ 1.00 m³ 1.25 m³ 1.50 m³ 1.75 m³ 1.00 m³ 1.25 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is d × d × s L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) d × d × s L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP