Estimating and Costing The brick work is measured in sq metre, in case of All of these Honey comb brick work Brick flat soling Half brick walls or the partition All of these Honey comb brick work Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 14° 12° 10° 8° 14° 12° 10° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of Bath room and lavatory The walls along with doors and other openings Kitchen and pantry All of these Bath room and lavatory The walls along with doors and other openings Kitchen and pantry All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: M.S. reinforcement of R.C.C. works Collapsible gates with rails Rolling shutters Expanded metal wire netting M.S. reinforcement of R.C.C. works Collapsible gates with rails Rolling shutters Expanded metal wire netting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Circular buildings All of these Hexagonal buildings Octagonal buildings Circular buildings All of these Hexagonal buildings Octagonal buildings ANSWER DOWNLOAD EXAMIANS APP