Estimating and Costing The brick work is measured in sq metre, in case of All of these Half brick walls or the partition Brick flat soling Honey comb brick work All of these Half brick walls or the partition Brick flat soling Honey comb brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Wall thickness Room area Courtyard area W' Area Wall thickness Room area Courtyard area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Transportation of materials Availability of materials All of these Quantity of the materials Transportation of materials Availability of materials All of these Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.5 0.25 1 0.75 0.5 0.25 1 0.75 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at Right angle to the centre line Intermediate points having abrupt change in gradient 30 meters apart All of these Right angle to the centre line Intermediate points having abrupt change in gradient 30 meters apart All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + (2 × 0.42 d) L - (0.42 d) L + 0.42 d L - (2 × 0.4 d) L + (2 × 0.42 d) L - (0.42 d) L + 0.42 d L - (2 × 0.4 d) ANSWER DOWNLOAD EXAMIANS APP