Estimating and Costing The brick work is measured in sq metre, in case of Honey comb brick work All of these Brick flat soling Half brick walls or the partition Honey comb brick work All of these Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Proportion of mortar All of these Specifications of materials Specifications of works Proportion of mortar All of these Specifications of materials Specifications of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for Ball valves Bib-cocks Stop-cocks All of these Ball valves Bib-cocks Stop-cocks All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Transportation of materials All of these Quantity of the materials Availability of materials Transportation of materials All of these Quantity of the materials Availability of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 150 mm 175 mm 100 mm 200 mm 150 mm 175 mm 100 mm 200 mm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. All of these Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item All of these Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item ANSWER DOWNLOAD EXAMIANS APP