Estimating and Costing The brick work is measured in sq metre, in case of Brick flat soling Honey comb brick work Half brick walls or the partition All of these Brick flat soling Honey comb brick work Half brick walls or the partition All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 1.5 m³ 3.5 m³ 2.5 m³ 5.0 m³ 1.5 m³ 3.5 m³ 2.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 39 D 30 D 59 D 50 D 39 D 30 D 59 D 50 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.274 m³ 0.247 m³ 0.200 m³ 0.295 m³ 0.274 m³ 0.247 m³ 0.200 m³ 0.295 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every 30 m intervals All of these At every change of direction At every change of gradient At every 30 m intervals All of these At every change of direction At every change of gradient ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of works Specifications of materials All of these Proportion of mortar Specifications of works Specifications of materials All of these Proportion of mortar ANSWER DOWNLOAD EXAMIANS APP