Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 1.5 m³ 2.5 m³ 3.5 m³ 5.0 m³ 1.5 m³ 2.5 m³ 3.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula Trapezoidal formula All of these Prismoidal formula Mid-section formula Trapezoidal formula All of these Prismoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is All of these Transportation of materials Availability of materials Quantity of the materials All of these Transportation of materials Availability of materials Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of direction At every 30 m intervals At every change of gradient All of these At every change of direction At every 30 m intervals At every change of gradient All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 27,500 m³ 27,000 m³ 26,000 m³ 26,500 m³ 27,500 m³ 27,000 m³ 26,000 m³ 26,500 m³ ANSWER DOWNLOAD EXAMIANS APP