Estimating and Costing The brick work is not measured in cu m in case of Reinforced brick work Brick work in arches One or more than one brick wall Half brick wall Reinforced brick work Brick work in arches One or more than one brick wall Half brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.03 sqm 0.04 sqm 0.01 sqm 0.02 sqm 0.03 sqm 0.04 sqm 0.01 sqm 0.02 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 30 D 59 D 39 D 50 D 30 D 59 D 39 D 50 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Cleats All listed here Brackets Bolts Cleats All listed here Brackets Bolts ANSWER DOWNLOAD EXAMIANS APP