Estimating and Costing
The brick work is not measured in cu m in case of

Brick work in arches
Reinforced brick work
One or more than one brick wall
Half brick wall

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The assumption on which the trapezoidal formula for volumes is based, is

The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied
All listed here
The end sections are parallel planes
The mid-area of a pyramid is half the average area of the ends

ANSWER DOWNLOAD EXAMIANS APP