Estimating and Costing The brick work is not measured in cu m in case of Half brick wall Reinforced brick work Brick work in arches One or more than one brick wall Half brick wall Reinforced brick work Brick work in arches One or more than one brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in Meters None of these Sq. m Cub. m Meters None of these Sq. m Cub. m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + 0.42 d L + (2 × 0.42 d) L - (2 × 0.4 d) L - (0.42 d) L + 0.42 d L + (2 × 0.42 d) L - (2 × 0.4 d) L - (0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 4.0 sq m 6.0 sq m 2.5 sq m 8.0 sq m 4.0 sq m 6.0 sq m 2.5 sq m 8.0 sq m ANSWER DOWNLOAD EXAMIANS APP