Estimating and Costing The brick work is not measured in cu m in case of One or more than one brick wall Reinforced brick work Half brick wall Brick work in arches One or more than one brick wall Reinforced brick work Half brick wall Brick work in arches ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Concrete Jeffries R.C. Chhajja P.C. (Damp proof course) Form works Concrete Jeffries R.C. Chhajja P.C. (Damp proof course) Form works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula All of these Prismoidal formula Trapezoidal formula Mid-section formula All of these Prismoidal formula Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 30 D 50 D 59 D 39 D 30 D 50 D 59 D 39 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Ventilators and glazing All listed here Collapsible gates Rolling shutters Ventilators and glazing All listed here Collapsible gates Rolling shutters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is √[d² × (ds)²] 2 L.D √(1 + s²) L.D √(1 + s²) d × d × s √[d² × (ds)²] 2 L.D √(1 + s²) L.D √(1 + s²) d × d × s ANSWER DOWNLOAD EXAMIANS APP