Estimating and Costing The brick work is not measured in cu m in case of Brick work in arches Half brick wall One or more than one brick wall Reinforced brick work Brick work in arches Half brick wall One or more than one brick wall Reinforced brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.247 m³ 0.295 m³ 0.274 m³ 0.200 m³ 0.247 m³ 0.295 m³ 0.274 m³ 0.200 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of All of these Honey comb brick work Brick flat soling Half brick walls or the partition All of these Honey comb brick work Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 70 cm 60 cm 75 cm to 80 cm 80 cm 70 cm 60 cm 75 cm to 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Pipes laid in trenches and pipes fixed to walls are measured separately Cutting through walls and floors are included with the item Pipes are classified according to their sizes and quality All of these Pipes laid in trenches and pipes fixed to walls are measured separately Cutting through walls and floors are included with the item Pipes are classified according to their sizes and quality All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The mid-area of a pyramid is half the average area of the ends The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The end sections are parallel planes All listed here The mid-area of a pyramid is half the average area of the ends The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The end sections are parallel planes All listed here ANSWER DOWNLOAD EXAMIANS APP