Estimating and Costing The measurement is made in square metre in case of R.C.C. structure Hollow concrete block wall Cement concrete in foundation None of these R.C.C. structure Hollow concrete block wall Cement concrete in foundation None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 20 minutes 40 minutes 30 minutes 25 minutes 20 minutes 40 minutes 30 minutes 25 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at Intermediate points having abrupt change in gradient 30 meters apart All of these Right angle to the centre line Intermediate points having abrupt change in gradient 30 meters apart All of these Right angle to the centre line ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and Half breadth of wall on each side One fourth breadth of wall on each side None of these Breadth of the wall Half breadth of wall on each side One fourth breadth of wall on each side None of these Breadth of the wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.025 0.05 0.04 0.02 0.025 0.05 0.04 0.02 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system All of these At every 30 m intervals At every change of gradient At every change of direction All of these At every 30 m intervals At every change of gradient At every change of direction ANSWER DOWNLOAD EXAMIANS APP