Estimating and Costing The measurement is made in square metre in case of R.C.C. structure Cement concrete in foundation Hollow concrete block wall None of these R.C.C. structure Cement concrete in foundation Hollow concrete block wall None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Surface dressing up to 15 cm depths Both (B) and (C) Ordinary cuttings up to 1 m Surface excavation up to 30 cm depths Surface dressing up to 15 cm depths Both (B) and (C) Ordinary cuttings up to 1 m Surface excavation up to 30 cm depths ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3250 m³ 3225 m³ 3300 m³ 3275 m³ 3250 m³ 3225 m³ 3300 m³ 3275 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for Bib-cocks Ball valves All of these Stop-cocks Bib-cocks Ball valves All of these Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Main soil pipe Top of P trap W.C. Bottom of P trap W.C. Side of water closet Main soil pipe Top of P trap W.C. Bottom of P trap W.C. Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Preliminary estimate Plinth area estimate Detailed estimate Cube rate estimate Preliminary estimate Plinth area estimate Detailed estimate Cube rate estimate ANSWER DOWNLOAD EXAMIANS APP