Estimating and Costing The measurement is made in square metre in case of Hollow concrete block wall Cement concrete in foundation R.C.C. structure None of these Hollow concrete block wall Cement concrete in foundation R.C.C. structure None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + 0.42 d L - (2 × 0.4 d) L + (2 × 0.42 d) L - (0.42 d) L + 0.42 d L - (2 × 0.4 d) L + (2 × 0.42 d) L - (0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd ½ (Bd + Sd2) Bd + Sd2 B × d - Sd1/2 B + d + Sd ½ (Bd + Sd2) Bd + Sd2 B × d - Sd1/2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Meter for length Liter for capacity Cubic metre for area Square meters for volume Meter for length Liter for capacity Cubic metre for area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and Breadth of the wall One fourth breadth of wall on each side Half breadth of wall on each side None of these Breadth of the wall One fourth breadth of wall on each side Half breadth of wall on each side None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.25 1 0.5 0.75 0.25 1 0.5 0.75 ANSWER DOWNLOAD EXAMIANS APP