Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 20 cm x 10 cm x 10 cm 23 cm x 11.5 cm x 7.5 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 20 cm x 10 cm x 10 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 1.5 m2 2.0 m2 4.0 m2 5.0 m2 1.5 m2 2.0 m2 4.0 m2 5.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Surface excavation Surface dressing Excavation Cutting Surface excavation Surface dressing Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate Area should be measured correct to 0.01 sqm Dimension should be measured correct to 0.01 m All of these Volume should be measured correct to 0.01 cum Area should be measured correct to 0.01 sqm Dimension should be measured correct to 0.01 m All of these Volume should be measured correct to 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Both (B) and (C) Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Both (B) and (C) Surface dressing up to 15 cm depths ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement regarding the centre line method of estimating a building The centre line is worked out separately for different sections of walls of a building Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item All of these The centre line length is reduced by half the layer of main wall joining the partition wall The centre line is worked out separately for different sections of walls of a building Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item All of these The centre line length is reduced by half the layer of main wall joining the partition wall ANSWER DOWNLOAD EXAMIANS APP