Estimating and Costing

Estimating and Costing
The expected out turn of half brick partition wall per mason per day is

5.0 m2
1.5 m2
2.0 m2
4.0 m2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of an item of work depends on

Specifications of works
All of these
Specifications of materials
Proportion of mortar

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Carpet area does not include the area of

The walls along with doors and other openings
Kitchen and pantry
Bath room and lavatory
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item whose weight is added to the weight of respective item, is

All listed here
Bolts
Cleats
Brackets

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The unit of measurement is per quintal for the following:

Expanded metal wire netting
M.S. reinforcement of R.C.C. works
Collapsible gates with rails
Rolling shutters

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The rate of payment is made for 100 cu m (per % cu m) in case of

Rock cutting
Earth work in excavation
Excavation in trenches for foundation
All of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑