Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Master trap All listed here Intercepting trap Interception manhole Master trap All listed here Intercepting trap Interception manhole ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3300 m³ 3225 m³ 3250 m³ 3275 m³ 3300 m³ 3225 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Length, breadth, height None of these Height, length, breadth Breadth, length, height Length, breadth, height None of these Height, length, breadth Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (0.42 d) L + 0.42 d L + (2 × 0.42 d) L - (2 × 0.4 d) L - (0.42 d) L + 0.42 d L + (2 × 0.42 d) L - (2 × 0.4 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm All of these Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm All of these Volume should be measured correct to 0.01 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work All of these Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work All of these Earthwork, Concrete work, Brick work ANSWER DOWNLOAD EXAMIANS APP