Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called All listed here Master trap Interception manhole Intercepting trap All listed here Master trap Interception manhole Intercepting trap ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is None of these (6 + 15) chains (6 + 12) chains (6 + 18) chains None of these (6 + 15) chains (6 + 12) chains (6 + 18) chains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Surface excavation up to 30 cm depths Both (B) and (C) Surface dressing up to 15 cm depths Ordinary cuttings up to 1 m Surface excavation up to 30 cm depths Both (B) and (C) Surface dressing up to 15 cm depths Ordinary cuttings up to 1 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of All of these Earth work in excavation Rock cutting Excavation in trenches for foundation All of these Earth work in excavation Rock cutting Excavation in trenches for foundation ANSWER DOWNLOAD EXAMIANS APP