• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

ESTIMATING AND COSTING

Estimating and Costing
The rate of payment is made for 100 cu m (per % cu m) in case of

All of these
Earth work in excavation
Excavation in trenches for foundation
Rock cutting

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

0.04
0.025
0.05
0.02

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

1000 m3
2000 m3
500 m3
1500 m3

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The concrete work for the following part of the building of specified thickness is measured in square meters

Floors
Wall panels
Root slabs
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

3.5 m³
5.0 m³
1.5 m³
2.5 m³

ANSWER DOWNLOAD EXAMIANS APP
  • «
  • 1
  • 2
  • 3
  • 4
  • ...
  • 16
  • »

GO TO PAGE

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑