Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by All of these Mid-section formula Prismoidal formula Trapezoidal formula All of these Mid-section formula Prismoidal formula Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for Stop-cocks Bib-cocks Ball valves All of these Stop-cocks Bib-cocks Ball valves All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Form works P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja Form works P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Wall panels Root slabs Floors All of these Wall panels Root slabs Floors All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied All listed here The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 500 m3 1500 m3 2000 m3 1000 m3 500 m3 1500 m3 2000 m3 1000 m3 ANSWER DOWNLOAD EXAMIANS APP