Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by All of these Prismoidal formula Trapezoidal formula Mid-section formula All of these Prismoidal formula Trapezoidal formula Mid-section formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Ventilators and glazing All listed here Rolling shutters Collapsible gates Ventilators and glazing All listed here Rolling shutters Collapsible gates ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of All of these Rock cutting Excavation in trenches for foundation Earth work in excavation All of these Rock cutting Excavation in trenches for foundation Earth work in excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Liter for capacity Cubic metre for area Meter for length Square meters for volume Liter for capacity Cubic metre for area Meter for length ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in embankment All of these Fully in excavation Partly in excavation and partly in embankment Fully in embankment All of these Fully in excavation Partly in excavation and partly in embankment ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of R.C. Chhajja Form works P.C. (Damp proof course) Concrete Jeffries R.C. Chhajja Form works P.C. (Damp proof course) Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP