Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Prismoidal formula All of these Mid-section formula Trapezoidal formula Prismoidal formula All of these Mid-section formula Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Excavation Surface dressing Surface excavation Cutting Excavation Surface dressing Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 26,000 m³ 26,500 m³ 27,500 m³ 27,000 m³ 26,000 m³ 26,500 m³ 27,500 m³ 27,000 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Concrete Jeffries Form works P.C. (Damp proof course) R.C. Chhajja Concrete Jeffries Form works P.C. (Damp proof course) R.C. Chhajja ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.50 m³ 1.75 m³ 1.00 m³ 1.25 m³ 1.50 m³ 1.75 m³ 1.00 m³ 1.25 m³ ANSWER DOWNLOAD EXAMIANS APP