Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and Half breadth of wall on each side None of these One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these One fourth breadth of wall on each side Breadth of the wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is All listed here The end sections are parallel planes The mid-area of a pyramid is half the average area of the ends The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied All listed here The end sections are parallel planes The mid-area of a pyramid is half the average area of the ends The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is 1.00 m³ 1.75 m³ 1.25 m³ 1.50 m³ 1.00 m³ 1.75 m³ 1.25 m³ 1.50 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Meter for length Cubic metre for area Liter for capacity Square meters for volume Meter for length Cubic metre for area Liter for capacity ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of P.C. (Damp proof course) R.C. Chhajja Form works Concrete Jeffries P.C. (Damp proof course) R.C. Chhajja Form works Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) L.D √(1 + s²) d × d × s √[d² × (ds)²] 2 L.D √(1 + s²) L.D √(1 + s²) d × d × s √[d² × (ds)²] ANSWER DOWNLOAD EXAMIANS APP