Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar In thin slabs, 12 mm minimum or diameter of the bar whichever is more All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar In thin slabs, 12 mm minimum or diameter of the bar whichever is more All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface dressing Cutting Excavation Surface excavation Surface dressing Cutting Excavation Surface excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Earth work in excavation All of these Rock cutting Excavation in trenches for foundation Earth work in excavation All of these Rock cutting Excavation in trenches for foundation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 4.00 cum 2.00 cum 1.00 cum 3.00 cum 4.00 cum 2.00 cum 1.00 cum 3.00 cum ANSWER DOWNLOAD EXAMIANS APP