Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and None of these Half breadth of wall on each side Breadth of the wall One fourth breadth of wall on each side None of these Half breadth of wall on each side Breadth of the wall One fourth breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Brick work in arches Reinforced brick work Broken glass coping Brick edging Brick work in arches Reinforced brick work Broken glass coping Brick edging ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 4.0 sq m 8.0 sq m 6.0 sq m 2.5 sq m 4.0 sq m 8.0 sq m 6.0 sq m 2.5 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing All of these Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing All of these Brickwork Flooring, Wood work, Steel work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in None of these Sq. m Meters Cub. m None of these Sq. m Meters Cub. m ANSWER DOWNLOAD EXAMIANS APP