Estimating and Costing According to ISI method of measurement, the order of the sequence is None of these Length, breadth, height Breadth, length, height Height, length, breadth None of these Length, breadth, height Breadth, length, height Height, length, breadth ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Wall panels Floors Root slabs All of these Wall panels Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Excavation Surface excavation Surface dressing Cutting Excavation Surface excavation Surface dressing Cutting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Ventilators and glazing Collapsible gates All listed here Rolling shutters Ventilators and glazing Collapsible gates All listed here Rolling shutters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 75 cm 70 cm 80 cm 90 cm 75 cm 70 cm 80 cm 90 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Square meters for volume Cubic metre for area Liter for capacity Meter for length Square meters for volume Cubic metre for area Liter for capacity Meter for length ANSWER DOWNLOAD EXAMIANS APP