Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height None of these Height, length, breadth Length, breadth, height Breadth, length, height None of these Height, length, breadth Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of Cement concrete in foundation Hollow concrete block wall None of these R.C.C. structure Cement concrete in foundation Hollow concrete block wall None of these R.C.C. structure ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Cube rate estimate Detailed estimate Preliminary estimate Plinth area estimate Cube rate estimate Detailed estimate Preliminary estimate Plinth area estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at All of these Intermediate points having abrupt change in gradient 30 meters apart Right angle to the centre line All of these Intermediate points having abrupt change in gradient 30 meters apart Right angle to the centre line ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula All of these The mean depth is the average of depths of two consecutive sections The area of mid-sections is calculated by using mean depth The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The mean depth is the average of depths of two consecutive sections The area of mid-sections is calculated by using mean depth The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 40 minutes 30 minutes 20 minutes 25 minutes 40 minutes 30 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP