Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Height, length, breadth None of these Length, breadth, height Breadth, length, height Height, length, breadth None of these Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The plinth area of a building not includes Area of cantilevered porch Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level Area of cantilevered porch Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work All of these Brickwork, Stone work, Roofing Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work All of these Brickwork, Stone work, Roofing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 4.0 m2 1.5 m2 5.0 m2 2.0 m2 4.0 m2 1.5 m2 5.0 m2 2.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Brackets Bolts All listed here Cleats Brackets Bolts All listed here Cleats ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd B × d - Sd1/2 Bd + Sd2 ½ (Bd + Sd2) B + d + Sd B × d - Sd1/2 Bd + Sd2 ½ (Bd + Sd2) ANSWER DOWNLOAD EXAMIANS APP