Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Height, length, breadth None of these Length, breadth, height Breadth, length, height Height, length, breadth None of these Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Proportion of mortar All of these Specifications of materials Specifications of works Proportion of mortar All of these Specifications of materials Specifications of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating All of these Circular buildings Hexagonal buildings Octagonal buildings All of these Circular buildings Hexagonal buildings Octagonal buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 25 minutes 40 minutes 30 minutes 20 minutes 25 minutes 40 minutes 30 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are All of these Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing All of these Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Collapsible gates Rolling shutters All listed here Ventilators and glazing Collapsible gates Rolling shutters All listed here Ventilators and glazing ANSWER DOWNLOAD EXAMIANS APP