Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Length, breadth, height Height, length, breadth None of these Breadth, length, height Length, breadth, height Height, length, breadth None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is Bd + Sd2 B + d + Sd B × d - Sd1/2 ½ (Bd + Sd2) Bd + Sd2 B + d + Sd B × d - Sd1/2 ½ (Bd + Sd2) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes All of these Bed concreting Setting and laying Connection to drains All of these Bed concreting Setting and laying Connection to drains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 2.5 m³ 5.0 m³ 3.5 m³ 1.5 m³ 2.5 m³ 5.0 m³ 3.5 m³ 1.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.025 0.02 0.04 0.05 0.025 0.02 0.04 0.05 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in embankment All of these Partly in excavation and partly in embankment Fully in excavation Fully in embankment All of these Partly in excavation and partly in embankment Fully in excavation ANSWER DOWNLOAD EXAMIANS APP