Estimating and Costing According to ISI method of measurement, the order of the sequence is None of these Length, breadth, height Breadth, length, height Height, length, breadth None of these Length, breadth, height Breadth, length, height Height, length, breadth ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 30 minutes 25 minutes 20 minutes 40 minutes 30 minutes 25 minutes 20 minutes 40 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Height, breadth, length Breadth, length, height None of these Length, breadth, height Height, breadth, length Breadth, length, height None of these Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 2000 m3 1500 m3 1000 m3 500 m3 2000 m3 1500 m3 1000 m3 500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) B × d - Sd1/2 B + d + Sd Bd + Sd2 ½ (Bd + Sd2) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is All listed here Cleats Bolts Brackets All listed here Cleats Bolts Brackets ANSWER DOWNLOAD EXAMIANS APP