Estimating and Costing According to ISI method of measurement, the order of the sequence is Height, length, breadth None of these Breadth, length, height Length, breadth, height Height, length, breadth None of these Breadth, length, height Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes All of these Setting and laying Bed concreting Connection to drains All of these Setting and laying Bed concreting Connection to drains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in None of these Sq. m Cub. m Meters None of these Sq. m Cub. m Meters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: All listed here Length of short walls in-to-in is 3.20 m Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m All listed here Length of short walls in-to-in is 3.20 m Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 70 cm 80 cm 90 cm 75 cm 70 cm 80 cm 90 cm 75 cm ANSWER DOWNLOAD EXAMIANS APP