Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height None of these Length, breadth, height Height, length, breadth Breadth, length, height None of these Length, breadth, height Height, length, breadth ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 70 cm 80 cm 60 cm 75 cm to 80 cm 70 cm 80 cm 60 cm 75 cm to 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for All of these Ball valves Bib-cocks Stop-cocks All of these Ball valves Bib-cocks Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.02 cum 0.03 cum 0.01 cum 0.04 cum 0.02 cum 0.03 cum 0.01 cum 0.04 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Cleats All listed here Brackets Bolts Cleats All listed here Brackets Bolts ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of R.C.C. structure Cement concrete in foundation None of these Hollow concrete block wall R.C.C. structure Cement concrete in foundation None of these Hollow concrete block wall ANSWER DOWNLOAD EXAMIANS APP