Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height None of these Height, length, breadth Length, breadth, height Breadth, length, height None of these Height, length, breadth Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 1 0.75 0.5 0.25 1 0.75 0.5 0.25 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by All of these Prismoidal formula Trapezoidal formula Mid-section formula All of these Prismoidal formula Trapezoidal formula Mid-section formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Building work (A) and (B) of the above Wall facing Columns, lintels, copings Building work (A) and (B) of the above Wall facing Columns, lintels, copings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings All listed here Water closets Lavatory basins Flushing pipes All listed here Water closets Lavatory basins Flushing pipes ANSWER DOWNLOAD EXAMIANS APP